My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 loading to unloading exceeds 30 minutes, the cover shall be securely attached to protect <br /> I2 the HMA. <br /> 3 <br /> I 4 The contractor shall provide an environmentally benign means to prevent the HMA <br /> 5 mixture from adhering to the hauling equipment. Excess release agent shall be drained <br /> 6 prior to filling hauling equipment with HMA. Petroleum derivatives or other coating <br /> 7 material that contaminate or alter the characteristics of the HMA shall not be used. For <br /> 8 live bed trucks, the conveyer shall be in operation during the process of applying the <br /> 9 release agent. <br /> 10 <br /> I11 5-04.3(3)C Pavers <br /> 12 HMA pavers shall be self-contained, power-propelled units, provided with an internally <br /> I 13 heated vibratory screed and shall be capable of spreading and finishing courses of HMA <br /> 14 plant mix material in lane widths required by the paving section shown in the Plans. <br /> 15 <br /> I <br /> 16 17 The HMA paver shall be in good condition and shall have the most current equipment <br /> available from the manufacturer for the prevention of segregation of the HMA mixture <br /> 18 installed, in good condition, and in working order. The equipment certification shall list <br /> I 19 the make, model, and year of the paver and any equipment that has been retrofitted. <br /> 20 <br /> 21 The screed shall be operated in accordance with the manufacturer's recommendations <br /> I 22 and shall effectively produce a finished surface of the required evenness and texture <br /> 23 without tearing, shoving, segregating, or gouging the mixture. A copy of the <br /> 24 manufacturer's recommendations shall be provided upon request by the Contracting <br /> 25 Agency. Extensions will be allowed provided they produce the same results, including <br /> 26 ride, density, and surface texture as obtained by the primary screed. Extensions without <br /> 27 augers and an internally heated vibratory screed shall not be used in the Traveled Way. <br /> I 28 <br /> 29 When specified in the Contract, reference lines for vertical control will be required. Lines <br /> 30 shall be placed on both outer edges of the Traveled Way of each Roadway. Horizontal <br /> I 31 control utilizing the reference line will be permitted. The grade and slope for intermediate <br /> 32 lanes shall be controlled automatically from reference lines or by means of a mat <br /> 33 referencing device and a slope control device. When the finish of the grade prepared for <br /> I 34 paving is superior to the established tolerances and when, in the opinion of the Engineer, <br /> 35 further improvement to the line, grade, cross-section, and smoothness can best be <br /> 36 achieved without the use of the reference line, a mat referencing device may be <br /> 37 substituted for the reference line. Substitution of the device will be subject to the <br /> I38 continued approval of the Engineer. A joint matcher may be used subject to the approval <br /> 39 of the Engineer. The reference line may be removed after the completion of the first <br /> 40 course of HMA when approved by the Engineer. Whenever the Engineer determines that <br /> I 41 any of these methods are failing to provide the necessary vertical control, the reference <br /> 42 lines will be reinstalled by the Contractor. <br /> 43 <br /> 44 The Contractor shall furnish and install all pins, brackets, tensioning devices, wire, and <br /> 45 accessories necessary for satisfactory operation of the automatic control equipment. <br /> i <br /> 46 <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> IWO#3788 March 2,2023 SP-75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.