My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 If the paving machine in use is not providing the required finish, the Engineer may <br /> 2 suspend Work as allowed by Section 1-08.6. Any cleaning or solvent type liquids spilled I <br /> 3 on the pavement shall be thoroughly removed before paving proceeds. <br /> 4 <br /> 5 5-04.3(3)D Material Transfer Device or Material Transfer Vehicle I <br /> 6 A Material Transfer Device/Vehicle (MTDN) shall only be used with the Engineer's <br /> 7 approval, unless otherwise required by the contract. <br /> 8 <br /> 9 Where an MTDN is required by the contract, the Engineer may approve paving without <br /> 10 an MTDN, at the request of the Contractor. The Engineer will determine if an equitable II <br /> 11 adjustment in cost or time is due. <br /> 12 <br /> 13 When used, the MTDN shall mix the HMA after delivery by the hauling equipment and <br /> 14 prior to laydown by the paving machine. Mixing of the HMA shall be sufficient to obtain a <br /> 15 uniform temperature throughout the mixture. If a windrow elevator is used, the length of <br /> 16 the windrow may be limited in urban areas or through intersections, at the discretion of I <br /> 17 the Engineer. <br /> 18 <br /> 19 To be approved for use, an MTV: I <br /> 20 <br /> 21 1. Shall be self-propelled vehicle, separate from the hauling vehicle or paver. <br /> 22 2. Shall not be connected to the hauling vehicle or paver. <br /> 23 3. May accept HMA directly from the haul vehicle or pick up HMA from a windrow. <br /> 24 4. Shall mix the HMA after delivery by the hauling equipment and prior to I <br /> 25 placement into the paving machine. <br /> 26 5. Shall mix the HMA sufficiently to obtain a uniform temperature throughout the <br /> 27 mixture. I <br /> 28 <br /> 29 To be approved for use, an MTD: <br /> 30 1 <br /> 31 1. Shall be positively connected to the paver. <br /> 32 2. May accept HMA directly from the haul vehicle or pick up HMA from a windrow. <br /> 33 3. Shall mix the HMA after delivery by the hauling equipment and prior to <br /> 34 placement into the paving machine. <br /> 35 4. Shall mix the HMA sufficiently to obtain a uniform temperature throughout the <br /> 36 mixture. <br /> 37 <br /> 38 5-04.3(3)E Rollers I <br /> 39 Rollers shall be of the steel wheel, vibratory, oscillatory, or pneumatic tire type, in good <br /> 40 condition and capable of reversing without backlash. Operation of the roller shall be in <br /> 41 accordance with the manufacturer's recommendations. When ordered by the Engineer I <br /> 42 for any roller planned for use on the project, the Contractor shall provide a copy of the <br /> 43 manufacturer's recommendation for the use of that roller for compaction of HMA. The <br /> 44 number and weight of rollers shall be sufficient to compact the mixture in compliance <br /> 45 with the requirements of Section 5-04.3(10). The use of equipment that results in <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.