My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 crushing of the aggregate will not be permitted. Rollers producing pickup, washboard, <br /> I <br /> 2 uneven compaction of the surface, displacement of the mixture or other undesirable <br /> 3 results shall not be used. <br /> I <br /> 4 <br /> 5 5-04.3(4) Preparation of Existing Paved Surfaces <br /> 6 When the surface of the existing pavement or old base is irregular, the Contractor shall <br /> I 7 bring it to a uniform grade and cross section as shown on the Plans or approved by the <br /> 8 Engineer. <br /> 9 <br /> I 10 Preleveling of uneven or broken surfaces over which HMA is to be placed may be <br /> 11 accomplished by using an asphalt paver, a motor patrol grader, or by hand raking, as <br /> 12 approved by the Engineer. <br /> I 13 <br /> 14 Compaction of preleveling HMA shall be to the satisfaction of the Engineer and may <br /> 15 require the use of small steel wheel rollers, plate compactors, or pneumatic rollers to <br /> I 16 avoid bridging across preleveled areas by the compaction equipment. Equipment used <br /> 17 for the compaction of preleveling HMA shall be approved by the Engineer. <br /> 18 <br /> 19 Before construction of HMA on an existing paved surface, the entire surface of the <br /> 20 pavement shall be clean. All fatty asphalt patches, grease drippings, and other <br /> 21 objectionable matter shall be entirely removed from the existing pavement. All <br /> I 22 pavements or bituminous surfaces shall be thoroughly cleaned of dust, soil, pavement <br /> 23 grindings, and other foreign matter. All holes and small depressions shall be filled with an <br /> 24 appropriate class of HMA. The surface of the patched area shall be leveled and <br /> ' 25 26 compacted thoroughly. Prior to the application of tack coat, or paving, the condition of <br /> the surface shall be approved by the Engineer. <br /> 27 <br /> I <br /> 28 29 A tack coat of asphalt shall be applied to all paved surfaces on which any course of HMA <br /> is to be placed or abutted; except that tack coat may be omitted from clean, newly paved <br /> 30 surfaces at the discretion of the Engineer. Tack coat shall be uniformly applied to cover <br /> I 31 the existing pavement with a thin film of residual asphalt free of streaks and bare spots at <br /> 32 a rate between 0.02 and 0.10 gallons per square yard of retained asphalt. The rate of <br /> 33 application shall be approved by the Engineer. A heavy application of tack coat shall be <br /> I 34 applied to all joints. For Roadways open to traffic, the application of tack coat shall be <br /> 35 limited to surfaces that will be paved during the same working shift. The spreading <br /> 36 equipment shall be equipped with a thermometer to indicate the temperature of the tack <br /> 37 coat material. <br /> 38 <br /> 39 Equipment shall not operate on tacked surfaces until the tack has broken and cured. If <br /> I <br /> 40 41 the Contractor's operation damages the tack coat it shall be repaired prior to placement <br /> of the HMA. <br /> 42 <br /> I 43 The tack coat shall be CSS-1, or CSS-1 h emulsified asphalt. The CSS-1 and CSS-1 h <br /> 44 emulsified asphalt may be diluted once with water at a rate not to exceed one part water <br /> 45 to one part emulsified asphalt. The tack coat shall have sufficient temperature such that <br /> I <br /> 46 47 it may be applied uniformly at the specified rate of application and shall not exceed the <br /> maximum temperature recommended by the emulsified asphalt manufacturer. <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> IWO#3788 March 2,2023 SP-77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.