My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 being moved to the HMA plant for processing into the final mixture. Different aggregate <br /> 2 sizes shall be kept separated until they have been delivered to the HMA plant. I <br /> 3 <br /> 4 5-04.3(6) Mixing <br /> 5 After the required amount of mineral materials, asphalt binder, recycling agent and anti- <br /> 6 stripping additives have been introduced into the mixer the HMA shall be mixed until <br /> 7 complete and uniform coating of the particles and thorough distribution of the asphalt I <br /> 8 binder throughout the mineral materials is ensured. <br /> 9 <br /> 10 When discharged, the temperature of the HMA shall not exceed the optimum mixing <br /> 11 temperature by more than 25°F as shown on the reference mix design report or as <br /> 12 approved by the Engineer. Also, when a WMA additive is included in the manufacture of <br /> 13 HMA, the discharge temperature of the HMA shall not exceed the maximum <br /> 14 recommended by the manufacturer of the WMA additive. A maximum water content of 2 <br /> 15 percent in the mix, at discharge, will be allowed providing the water causes no problems <br /> 16 with handling, stripping, or flushing. If the water in the HMA causes any of these <br /> 17 problems, the moisture content shall be reduced as directed by the Engineer. I <br /> 18 <br /> 19 Storing or holding of the HMA in approved storage facilities will be permitted with <br /> 20 approval of the Engineer, but in no event shall the HMA be held for more than 24 hours. <br /> 21 HMA held for more than 24 hours after mixing shall be rejected. Rejected HMA shall be <br /> 22 disposed of by the Contractor at no expense to the Contracting Agency. The storage <br /> 23 facility shall have an accessible device located at the top of the cone or about the third I <br /> 24 point. The device shall indicate the amount of material in storage. No HMA shall be <br /> 25 accepted from the storage facility when the HMA in storage is below the top of the cone <br /> 26 of the storage facility, except as the storage facility is being emptied at the end of the I <br /> 27 working shift. <br /> 28 <br /> 29 Recycled asphalt pavement (RAP) utilized in the production of HMA shall be sized prior I <br /> 30 to entering the mixer so that a uniform and thoroughly mixed HMA is produced. If there is <br /> 31 evidence of the recycled asphalt pavement not breaking down during the heating and <br /> 32 mixing of the HMA, the Contractor shall immediately suspend the use of the RAP until ' <br /> 33 changes have been approved by the Engineer. After the required amount of mineral <br /> 34 materials, RAP, new asphalt binder and asphalt rejuvenator have been introduced into <br /> 35 the mixer the HMA shall be mixed until complete and uniform coating of the particles and <br /> 36 thorough distribution of the asphalt binder throughout the mineral materials, and RAP is <br /> 37 ensured. <br /> 38 I 39 5-04.3(7) Spreading and Finishing <br /> 40 The mixture shall be laid upon an approved surface, spread, and struck off to the grade <br /> 41 and elevation established. HMA pavers complying with Section 5-04.3(3) shall be used <br /> 42 to distribute the mixture. Unless otherwise directed by the Engineer, the nominal <br /> 43 compacted depth of any layer of any course shall not exceed the following: <br /> 44 I <br /> 45 HMA Class 1" 0.35 feet <br /> 46 HMA Class 3/4" and HMA Class '/2" I <br /> 47 wearing course 0.30 feet <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) I <br /> WO#3788 March 2,2023 SP-80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.