My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Section 00 72 00 GENERAL CONDITIONS <br /> issuance of this certificate of completion will not constitute acceptance of unauthorized or defective Work <br /> or material is performed. <br /> 7.3. HOURS OF LABOR I <br /> Contractor shall comply with all applicable laws and regulations regarding hours of work,including,but <br /> not limited to, RCW Chap.49.28. <br /> 7.4. CONTRACT WORK HOURS <br /> The Contractor shall comply with Section 103 of the Contract Work Hours and Safety Standards Act(40 <br /> U.S.C. section 327-330)as supplemented by Department of Labor Regulations(29 CFR,Part 5). Under <br /> this section the Contractor shall compute the wages of every mechanic and laborer on the basis of a <br /> standard work week of forty(40)hours. Work in excess of the standard work week is permissible, <br /> provided the worker is compensated as required by law. <br /> 7.5. OVERTIME WORK <br /> Overtime and shift work may be established as a regular procedure by the Contractor with reasonable <br /> Notice to and written permission of the Owner's Representative. Permission may be denied for such <br /> reasons as noise,traffic,or other interference with the neighborhood in which the Project is located,or the <br /> lack of availability of inspectors during overtime or shift work. <br /> 7.6 LABOR RELATIONS I <br /> The Contractor shall take all reasonable steps to prevent any labor Disputes involving the Contractor and <br /> any of its Subcontractors or Suppliers of any products or services from disrupting the Work under this <br /> Contract or interfering with access to the Owner's property by the Owner,including its agents, <br /> representatives,employees and officials,any other contractors engaged in construction activities,or <br /> members of the public. In the event any picketing or other concerted activity by employees involved in a <br /> labor Dispute with the Contractor or its Subcontractors or Suppliers interferes in any way with access to111 <br /> the Owner's property by any persons,the Contractor shall promptly and expeditiously take all reasonable <br /> actions to eliminate or minimize such interference,including but not limited to: (1)utilizing all <br /> reasonable means of restricting any picketing to a single entrance to the Owner's property;(2)posting <br /> notices or signs which advise interested persons and labor organizations that a particular entrance to the <br /> Owner's property is for the employees of"primary" or,as the case may be, "neutral" employers; (3) <br /> policing entrances to ensure that only authorized personnel may use those entrances; (4)notifying all <br /> interested labor organizations of the"primary" or"neutral" status of particular entrances; and(5)in the 111 <br /> event any such picketing or concerted activity is unlawful or has a secondary impact upon the employees <br /> of neutral employers,promptly and expeditiously taking appropriate action to seek recourse through the <br /> appropriate governmental agency or state or federal courts to limit the location of such picketing so as to <br /> reduce the impact thereof upon neutral employers. <br /> The Owner will cooperate with the Contractor to accomplish the foregoing actions and will render <br /> assistance as may be in the best interests of the Owner. However,the Owner shall have the right to direct <br /> the Contractor to modify any of the foregoing actions the Contractor has taken or plans to take or to <br /> overrule such actions,to designate the entrances to be used as "primary" or"neutral"entrances,and to <br /> take appropriate legal action in order to protect the Owner's property and interests. In any event,the <br /> Contractor shall be liable for all Delays and costs,including costs to the Owner,and actual damages <br /> resulting from the relocation,rerouting,Delays or actions required to maintain the uninterrupted progress <br /> of the Work. Failure by the Contractor to take the actions described above or to comply with the <br /> directives of the Owner shall be considered a breach of this Contract and the Owner may terminate the <br /> Contract or suspend the Contractor as provided in this Contract. <br /> I <br /> City of Everett 00 72 00-26 February 2023 <br /> WPCF TFI Bar Screen Upgrades <br /> UP3770 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.