My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 01 11 00 SUMMARY OF WORK <br /> 1.10 CODES AND STANDARD SPECIFICATIONS <br /> A. All construction shall be in accordance with the International Building Code, <br /> current adopted edition. <br /> B. All construction shall be in accordance with the National Electrical Code, latest <br /> edition. I <br /> C. All construction shall be in accordance with the Uniform Mechanical Code and <br /> the Uniform Plumbing Code, latest editions. I <br /> D. All construction shall be in conformance with the WSDOT/APWA Standard <br /> Specifications and Standard Plans, latest editions. <br /> E. All construction shall be in conformance with the City of Everett Design and <br /> Construction Standards and Specifications, latest edition. <br /> F. All work shall comply with applicable requirements of Snohomish County. <br /> G. Any material specified by reference to the number, symbol, or title of a specified <br /> standards, such as a trade association standard or other similar standard, shall <br /> comply with the requirements of the latest revision thereof, and any amendment <br /> or supplement thereto in effect on the date of Invitation for Bids, except as limited <br /> to type, class or grade, or modified in such references. All work shall conform to <br /> the standard referred to, except as modified in these Specifications and the <br /> Drawings. <br /> 1.11 CHECKING PLANS AND SPECIFICATIONS <br /> A. Prior Submission of Bids: The Contractor shall report any discrepancies or <br /> omissions in the plans and/or specifications to the Owner for a decision prior to <br /> the Submission of Bids. <br /> B. Resolution of Conflicts: Where there is conflict between the plans and the 1 <br /> specifications in regard to materials, equipment, sizes, numbers or locations, the <br /> Owner shall be the sole judge in resolving the conflict. <br /> PART 2 : PRODUCTS <br /> Not Used. <br /> PART 3 : EXECUTION <br /> Not Used. I <br /> END OF SECTION 01 11 00 1 <br /> I <br /> City of Everett 01 11 00-4 February 2023 <br /> WPCF TFI Bar Screen Upgrades <br /> UP3770 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.