My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 01 11 00 SUMMARY OF WORK <br /> 1.05 WORK SEQUENCE <br /> MA. Work in stages in order to accommodate the Owner's use requirements during <br /> the construction period. Coordinate construction schedule and operations with <br /> the Owner. See Section 01 32 11 for further requirements. <br /> 1.06 PERMITS <br /> A. The Contractor shall be responsible to obtain and pay the cost of any applicable <br /> permits required to do the Work, and such costs shall be included in their Bid. <br /> B. It is anticipated that an electrical permit will be required for the relocation of <br /> electrical conduit associated with the project. A building permit will not be <br /> required for the project. <br /> 1.07 WORK BY OTHERS <br /> A. The Contractor is required to coordinate all their activities with the Owner's <br /> Project Manager, or his/her designee. The Owner may have other construction <br /> projects in progress Water Pollution Control Facility (WPCF) during the duration <br /> of this project and it is the Contractor's responsibility to assure that adequate <br /> notice is given to the Owner's Project Manager regarding equipment or materials <br /> that may need to be relocated in order to perform the work. The Contractor shall <br /> also work with the Owner to coordinate scheduled activities, deliveries, site <br /> security, and use of areas on site for laydown/staging if any perceived conflicts <br /> were to occur. <br /> 1.08 WORK BY THE OWNER AND SPECIAL INSPECTIONS <br /> A. The Owner shall have the right to access the project site 24/7 and execute work <br /> not included in this Contract and concurrent with the contract period. Contractor <br /> shall cooperate with such Owner sponsored efforts. <br /> B. The Contractor shall coordinate with the Owner in scheduling operations to <br /> minimize conflict with any concurrent construction projects, plant operations and <br /> maintenance activities. <br /> C. The Contractor shall coordinate with the Owner in scheduling and providing <br /> access for special inspections required for the Work. <br /> t1.09 DOCUMENT EXISTING CONDITIONS <br /> A. Prior to commencing the Work, the Contractor shall tour the site with the Owner <br /> to examine and document photographically, with video, and/or in writing the <br /> condition of existing structures, equipment, sidewalks, roadways, and other <br /> existing improvements on or adjacent to the site and work areas. This record <br /> shall serve as a basis for determination of subsequent damage due to the <br /> Contractor's operations and shall be signed by all parties making the tour. The <br /> Contractor shall record existing conditions with a digital camera or video. The <br /> photo or video files shall be titled with the date and areas and provided <br /> electronically to the Owner. <br /> City of Everett 01 11 00 3 February 2023 <br /> WPCF TFI Bar Screen Upgrades <br /> UP3770 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.