Laserfiche WebLink
I <br /> Section 01 22 20 MEASUREMENT AND PAYMENT <br /> C. The following construction activities and costs shall be considered incidental to <br /> the Bid Items of the contract and no separate measurement and payment will be <br /> I made: <br /> 1. Loading, hauling, and properly disposing offsite of demolition, excavation, <br /> grading, and other discarded materials unless otherwise noted, <br /> 111 2. Offsite disposal fees and disposal records, unless otherwise noted, <br /> 3. Dewatering trenches and excavations (including, but not limited to, <br /> pumping equipment, generators, tanks, filters, discharge permits, and if <br /> required, water quality treatment and removal of sediment), <br /> 4. Saw cutting asphalt pavements, pipes, concrete, and structures, <br /> 5. Locating existing buried utilities to determine precise location and depth, <br /> including potholing, <br /> 6. Protecting existing utilities, equipment, and structures from damage or <br /> disturbance, including paying utilities for supervision and assistance, <br /> 7. Repair or replacement of utilities, structures, and equipment damaged by <br /> construction activities and/or financial reimbursement to affected utility <br /> purveyor, <br /> 8. Furnishing, installing, maintaining, moving, and removing temporary <br /> Ishoring, <br /> 9. Furnishing, placing, maintaining, and removing cold mix asphalt, <br /> 10. Dust control, <br /> 11. Stockpiling and covering suitable native material for uses described in the <br /> specifications and/or drawings, <br /> ' 12. Facilitating soil compaction testing by the Owner's third party testing firm, <br /> 13. Moisture conditioning native soils for reuse on site, at optimum moisture <br /> content for compaction, <br /> 14. Watering soils, plants, vegetation, hydroseed, <br /> 15. Trimming and cleanup, <br /> 16. Costs for compliance with permit conditions set forth in approved permits, <br /> 17. Furnishing submittals and manufacturer's certificates of compliance, <br /> 18. Coordination and notifications with Owner staff and its agents, Engineer, <br /> governing agencies, and all other persons and entities participating in, or <br /> affected by, construction activities, <br /> 19. Maintaining continual vehicular access to driveways and access roads, <br /> 20. Furnishing, installing, inspecting, repairing, moving & removing temporary <br /> fencing and barricades for security and safety, <br /> 21. Any additional labor, materials, equipment and incidentals not specifically <br /> covered under a separate bid item. <br /> I <br /> City of Everett 01 22 20-5 February 2023 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> I <br />