My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 01 22 20 MEASUREMENT AND PAYMENT <br /> D. The Measurement and Payment for the following Bid Item descriptions apply to <br /> the corresponding Bid Items as included in the Proposal: <br /> Bid Item 1. Mobilization I <br /> The lump sum (LS) Contract Price for"Mobilization" shall constitute complete <br /> compensation for all of Contractor's pre-construction costs of preparatory <br /> work and operations including, but not limited to, those necessary for the 111 <br /> movement of his personnel, equipment, supplies and incidentals to the <br /> Project site; for the establishment of his offices, buildings and other facilities <br /> necessary for Work on this Project as required by these specifications, and <br /> State and local laws and regulations; for premiums on bonds and insurance <br /> for the Project, and for Work and operations that he must perform or costs he <br /> must incur before beginning production work on the various items on the <br /> Project. Mobilization also includes, but is not limited to, posting construction <br /> identification signs, securing permits, establishing safety and security <br /> measures, submitting a health and safety plan, documenting existing <br /> conditions, developing a Schedule of Values for lump sum bid items, <br /> preparing applications for payment, submitting the project schedule and <br /> updates, and providing product and material submittals. Also include <br /> mobilization costs for all subcontracted work along with all costs for utility <br /> coordination noted on the Drawings and in the Specifications. <br /> Items not included in this item include, but are not limited to, Work covered by <br /> a specific bid item or Work that is to be included in a bid item or items and <br /> profit, interest on borrowed money, overhead, or management costs. <br /> Partial payments will be made for the lump sum contract price for <br /> "Mobilization" as follows: <br /> • When 5% of the total original contract amount is earned from other bid <br /> items, 50% of the amount bid for mobilization, or 5% of the total <br /> original contract amount, whichever is the least, will be paid. <br /> • When 10% of the total original contract amount is earned from other <br /> bid items. 100% of the amount bid for mobilization, or 10% of the total <br /> contract amount, whichever is the least, will be paid. <br /> • Upon completion of all work on the project, payment of any amount <br /> bid for mobilization in excess of 10% of the total original contract <br /> amount will be paid. <br /> Bid Item 2. Construction Surveying <br /> The lump sum (LS) Contract Price for"Construction Surveying" includes, but <br /> is not limited to, all costs associated with furnishing all labor, tools, survey <br /> instruments materials, and other equipment necessary for: <br /> • Setting and monitoring the location, elevation, alignment and grade of <br /> the Work as shown in the Drawings. <br /> • Verifying elevations, prior to construction, of all existing structures and I <br /> pipes to which connections are to be made. <br /> • Verifying horizontal and vertical alignment of new and existing pipes. <br /> • All other survey needed or required. <br /> City of Everett 01 22 20-6 February 2023 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> I <br />