U <br /> Section 01 22 20 MEASUREMENT AND PAYMENT <br /> 3. Excavation; hauling and proper disposal of excess and unsuitable <br /> excavated native materials; hand digging as necessary; installation of <br /> the precast vault including geotextile; installation of the new 48-inch <br /> ALE pipe including couplings, flexible connectors, and polyethylene <br /> wrap (for ductile iron pipe); pressure testing the 48-inch ALE pipeline; <br /> placing and compacting suitable native material; and grading the <br /> backfilled surface to match existing grade. No extra payment shall be <br /> made for removing, loading, hauling, and disposing of displaced and <br /> unsuitable material. The cost of furnishing, placing, and compacting <br /> pipe bedding, precast junction vault subgrade and imported trench <br /> backfill are included under Bid Items for "Crushed Surfacing Base <br /> Course" and "Gravel Borrow". <br /> 4. Connecting the new 48-inch ALE piping to the existing 48-inch ALE <br /> piping and to the new precast junction vault. <br /> 5. Installing stainless steel grating atop the precast junction vault. <br /> 6. Steel sheeting for covering open excavations left overnight to protect <br /> Owner staff from injury and property damage. <br /> 7. Protection, restoration, and repair of existing utilities, structures, <br /> equipment, and features that are to remain. <br /> 8. Ethafoam pads or sand backfill, as necessary, to maintain separation <br /> between the 48-inch ALE pipeline and other pipes. I <br /> 9. Extra depth, including excavation, backfill and compaction required to <br /> clear known buried utilities or other known obstacles. <br /> 10. Furnishing and installing warning tape over the 48-inch ALE pipe. 1 <br /> Work required to avoid unexpected or unforeseen utilities shall be paid for <br /> under the Bid Item "Resolution of Utility Conflicts. The costs for potholing and <br /> excavation required to determine exact depths and locations of other utilities <br /> shall be included with this Work with no direct compensation made. <br /> Bid Item 21. Hydraulic Gates I <br /> The lump sum (LS) Contract Price for"Hydraulic Gates" shall constitute full <br /> compensation for all Work, labor, materials, tools, and equipment necessary <br /> to furnish and install the hydraulic gates as shown on the Drawings and <br /> specified herein, and includes, but is not limited to, the gates, anchors, <br /> hardware, stem, stem guides, operator, pedestal, pedestal support bracket, <br /> grout, and appurtenances necessary for a complete installation. The lump <br /> sum price also includes demonstrating operation of the gates, testing the <br /> gates to confirm they meet the requirements for leakage, and making <br /> adjustments as required. <br /> Bid Item 22. Static Weir Assembly <br /> The lump sum (LS) Contract Price for"Static Weir Assembly" shall constitute <br /> full compensation for all Work, labor, materials, tools, and equipment <br /> necessary to fabricate, furnish and install the static weir assembly as shown <br /> on the Drawings and specified herein, and includes, but is not limited to, the <br /> weir plate, stiffening and mounting angles, anchors, hardware, grout, and <br /> appurtenances necessary for a complete installation. <br /> City of Everett 01 22 20-14 February 2023 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> I <br />