McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Section 01 22 20 MEASUREMENT AND PAYMENT <br /> 2. All required potholing to verify locations of other utilities in or near the <br /> trench lines. <br /> 3. Trench excavation; hauling and proper disposal of excess and <br /> unsuitable excavated native materials; hand digging as necessary; <br /> installation of pipe, fittings, couplings, and polyethylene wrap (for <br /> ductile iron pipe); pressure testing; placing and compacting suitable <br /> native material; and grading the backfilled surface to match existing <br /> grade. No extra payment shall be made for removing, loading, <br /> hauling, and disposing of displaced and unsuitable material. The cost <br /> of furnishing, placing, and compacting pipe bedding and imported <br /> trench backfill are included under Bid Items for"Crushed Surfacing <br /> Base Course" and "Gravel Borrow". <br /> 4. Connecting the new relocated trench drain piping to the existing <br /> trench drain piping. <br /> ' S. Steel sheeting for covering open excavations left overnight to protect <br /> Owner staff from injury and property damage. <br /> 6. Protection, restoration, and repair of existing utilities, structures, <br /> equipment, and features that are to remain. <br /> 7. Ethafoam pads or sand backfill, as necessary, to maintain separation <br /> between the 10-inch tank drain pipeline and other pipes. <br /> i8. Extra depth, including excavation, backfill and compaction required to <br /> clear known buried utilities or other known obstacles. <br /> 9. Furnishing and installing warning tape over 10-inch tank drain pipe. <br /> Work required to avoid unexpected or unforeseen utilities shall be paid for <br /> under the Bid Item "Resolution of Utility Conflicts. The costs for potholing and <br /> excavation required to determine exact depths and locations of other utilities <br /> shall be included with this Work with no direct compensation made. <br /> Bid Item 20. Precast Junction Vault and 48-inch ALE Pipeline <br /> The lump sum (LS) Contract Price for"Precast Junction Vault and 48-inch <br /> ALE Pipeline" shall be full compensation for costs of all Work, labor, tools, <br /> materials, equipment, and incidentals necessary to furnish and install the <br /> precast junction vault, sections of new 48-inch aerated lagoon effluent(ALE) <br /> piping, and all associated appurtenances as shown on the Drawings and <br /> specified herein, and additionally, shall include, but not be limited to, the <br /> following: <br /> 1. Removal of structures or obstructions not specifically covered under <br /> other Bid Items. This shall include, but not be limited to, removal and <br /> disposal of the existing asphalt concrete pavement, sidewalk, curb, <br /> thrust blocks, miscellaneous landscaping, and sod as indicated on the <br /> Plans. <br /> 2. All required potholing to verify locations of other utilities in or near the <br /> excavation for installation of the precast vault. <br /> I <br /> City of Everett 01 22 20 13 February 2023 <br /> Evergreen Pump Station Modifications <br /> UP374 7-3 <br /> I <br />