McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ' SECTION 0011 13 <br /> ADVERTISEMENT FOR BIDS <br /> Notice is hereby given that sealed bids for the Water Pollution Control Facility (WPCF) TFI <br /> Bar Screen Upgrades project will be received at the office of the City Clerk, 1ST Floor Everett <br /> Municipal Building, 2930 Wetmore, Everett, WA, 98201, until 2:00 p.m. on Tuesday, March 7th, <br /> 2023. At the appointed time, all bids will be opened and read aloud publicly via live streaming, <br /> or bidders may attend the bid opening in person at 2930 Wetmore Ave, Suite 9E, Everett, WA <br /> 98201. The link to view the live streaming bid opening can be found at: <br /> https://everettwa.gov/319/Procurement. <br /> The engineer's estimate for this Project is $1,516,000.00 not including sales tax. <br /> The City of Everett owns the Water Pollution Control Facility (WPCF) at 4027 4th Street SE, <br /> Everett, WA 98201 and is seeking a Contractor to construct and/or install the following, but not <br /> limited to: <br /> 1. Relocation of existing electrical and fiber optic conduits and a 10-inch tank drain <br /> I pipeline. <br /> 2. Trenching, excavation, shoring, dewatering, piping, fittings, couplings, flexible <br /> connectors, bedding, backfill, and compaction for installation of a new 36-inch bypass <br /> pipeline and precast concrete junction vault. <br /> 3. Temporary erosion and sediment control measures. <br /> 4. Bypass pumping during installation of the new 36-inch bypass pipeline, precast concrete <br /> junction vault, and associated slide gates. <br /> 5. Asphalt paving removal and replacement associated with excavation for the pipeline and <br /> precast vault. <br /> 6. Demolition of a section of the existing 48-inch aerated lagoon effluent (ALE) pipeline <br /> downstream of the Recirculation/Bypass Flow Control Structure to allow installation of <br /> the new precast concrete junction vault. <br /> 7. Connection of the new precast concrete junction vault to the existing 48-inch ALE <br /> pipeline upstream and downstream of the vault. <br /> 8. Coring a hole and installing a slide gate in existing Diversion Structure 2 for connection <br /> and isolation of the new 36-inch bypass pipeline. <br /> 9. Installing a slide gate in the eastern compartment of the Recirculation/Bypass Flow <br /> Control Structure for isolation of the 48-inch ALE pipeline from Diversion Structure 2. <br /> 10. Installing slide gates in the new precast concrete junction vault for isolation of the <br /> 48-inch ALE pipeline downstream of the eastern compartment of the <br /> Recirculation/Bypass Flow Control Structure and the downstream end of the new <br /> 36-inch bypass pipeline. <br /> 11. Demolishing an existing slide gate and flap gate in the existing Recirculation/Bypass <br /> Flow Control Structure. <br /> 12. Fabricating and installing a new static weir assembly in the western compartment of the <br /> Recirculation/Bypass Flow Control Structure. <br /> City of Everett 00 11 13-1 February 2023 <br /> WPCF TFI Bar Screen Upgrades <br /> UP3770 <br /> I <br />