Laserfiche WebLink
I <br /> SECTION 00 21 13 <br /> INSTRUCTIONS TO BIDDERS <br /> PART 1 : GENERAL <br /> 1.00 INTRODUCTORY MATTERS <br /> The Work to be performed will include furnishing all labor, materials, equipment, and incidentals <br /> necessary to perform all Work as required by the Contract in accordance with the Contract <br /> Documents for the installation of a new 36-inch bypass pipeline and precast concrete junction <br /> vault and modifications to the Diversion Structure 2 and Recirculation/Bypass Flow Control <br /> Structure. <br /> The Project is located at 4027 4th Street SE, Everett, WA 98201. <br /> Project Manager <br /> Questions and inquiries about these Contract Documents should be directed in writing to the <br /> attention of John Nottingham, PE, jnottingham©everettwa.gov. <br /> Standard Specifications <br /> The following other Specifications and Standard Plans shall apply only to the extent that they <br /> are called out in the Contract Documents. <br /> • WSDOT"2022 Standard Specifications for Road, Bridge and Municipal Construction", <br /> hereinafter referred to as the "Standard Specifications." <br /> • City of Everett "Design and Construction Standards and Specifications" (Revised <br /> January 2018), as found online on the City's Website at: <br /> https://www.everettwa.gov/1531/Design-Construction-Standards. <br /> • "Standard Plans for Road and Bridge Construction," latest edition as prepared by <br /> WSDOT <br /> • "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition. <br /> • APWA Standards, latest edition. <br /> • AWWA Standards, latest edition. <br /> • American Concrete Institute (ACI), latest edition. <br /> 1-01 DEFINITIONS AND TERMS <br /> 1-01.3 Definitions <br /> Definitions are found in SECTION 7200 GENERAL CONDITIONS. <br /> I <br /> I <br /> City of Everett 00 29 13 1 February 2023 <br /> WPCF TFI Bar Screen Upgrades <br /> UP3770 <br /> I <br />