My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> SECTION 00 21 13 <br /> INSTRUCTIONS TO BIDDERS <br /> PART 1 : GENERAL <br /> 1.00 INTRODUCTORY MATTERS <br /> The Work to be performed will include furnishing all labor, materials, equipment, and incidentals <br /> necessary to perform all Work as required by the Contract in accordance with the Contract <br /> Documents for the installation of a new 36-inch bypass pipeline and precast concrete junction <br /> vault and modifications to the Diversion Structure 2 and Recirculation/Bypass Flow Control <br /> Structure. <br /> The Project is located at 4027 4th Street SE, Everett, WA 98201. <br /> Project Manager <br /> Questions and inquiries about these Contract Documents should be directed in writing to the <br /> attention of John Nottingham, PE, jnottingham©everettwa.gov. <br /> Standard Specifications <br /> The following other Specifications and Standard Plans shall apply only to the extent that they <br /> are called out in the Contract Documents. <br /> • WSDOT"2022 Standard Specifications for Road, Bridge and Municipal Construction", <br /> hereinafter referred to as the "Standard Specifications." <br /> • City of Everett "Design and Construction Standards and Specifications" (Revised <br /> January 2018), as found online on the City's Website at: <br /> https://www.everettwa.gov/1531/Design-Construction-Standards. <br /> • "Standard Plans for Road and Bridge Construction," latest edition as prepared by <br /> WSDOT <br /> • "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition. <br /> • APWA Standards, latest edition. <br /> • AWWA Standards, latest edition. <br /> • American Concrete Institute (ACI), latest edition. <br /> 1-01 DEFINITIONS AND TERMS <br /> 1-01.3 Definitions <br /> Definitions are found in SECTION 7200 GENERAL CONDITIONS. <br /> I <br /> I <br /> City of Everett 00 29 13 1 February 2023 <br /> WPCF TFI Bar Screen Upgrades <br /> UP3770 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.