Laserfiche WebLink
I <br /> Section 00 21 13 INSTRUCTIONS TO BIDDERS <br /> The boring log data and soil sample data, if any, are included in the bid documents. <br /> If there is a geotechnical report made by the City, Bidder may contact the Project Manager <br /> to arrange to view the geotechnical report. <br /> 1-02.5 Bid Form <br /> The City reserves the right to arrange the bid forms with alternates and additives, if such be to <br /> the advantage of the City. The Bidder shall bid on all alternates and additives set forth in the Bid <br /> Form unless otherwise specified. I <br /> 1-02.6 Preparation of Bid <br /> Bids shall be submitted on the forms provided by the City and found in the Contract Documents. I <br /> All blank spaces in the Bid form shall be legibly filled in using a non-erasable medium. Do not <br /> qualify Bids, since this will automatically be cause for rejection of the Bid. <br /> A Bid will be rejected if the authorized Bid form furnished by the City is not used. <br /> Bid prices shall include everything necessary for the completion of the Work including, but not <br /> limited to, providing the materials, equipment, tools, plant and other facilities, and the <br /> management, superintendence, labor, and all necessary testing services. <br /> Bidders are warned against making erasures or alterations of any kind to the Bid Form, and bids I <br /> that contain omissions, erasures, or irregularities of any kind may be rejected. No oral, <br /> telegraphic, electronic, or telephonic bids or modifications will be considered. <br /> In the event that the product of a unit price and an estimated quantity does not equal the I <br /> extended amount quoted, the unit price shall govern, and the correct product of the unit price <br /> and the estimated quantity shall be deemed to be the amount bid. If the sum of two or more <br /> items in a bidding schedule does not equal the total amounts quoted, the individual item <br /> amounts shall govern and the correct total shall be deemed to be the amount bid. <br /> RCW 35.22.650 CERTIFICATION I <br /> Contractor agrees that the Contractor shall actively solicit the employment of minority group <br /> members. Contractor further agrees that the Contractor shall actively solicit Bids for the <br /> subcontracting of goods or services from qualified minority businesses. Contractor shall furnish <br /> evidence of the Contractor's compliance with these requirements of minority employment and <br /> solicitation. Contractor further agrees to consider the grant of subcontracts to said minority <br /> bidders on the basis of substantially equal proposals in the light most favorable to said minority <br /> businesses. The Contractor is required to submit evidence of compliance with this section as <br /> part of the Bid by completing and submitting with the Bid the RCW 35.22.650 CERTIFICATION. <br /> PROPOSED SUBCONTRACTORS FORM I <br /> Bidder shall complete SECTION 00 4336 — PROPOSED SUBCONTRACTORS FORM and <br /> submit it with the Bid. <br /> NONCOLLUSION AFFIDAVIT <br /> The City has determined every Bidder must submit a Non-Collusion Affidavit for every Project. <br /> Accordingly, the Bidder shall submit a "Non-Collusion Affidavit", contained in the Contract <br /> Documents as SECTION 4519 NONCOLLUSION AFFIDAVIT, with the Bid. If the City has <br /> reason to believe that collusion exists among Bidders, the City will reject the Bids of the known <br /> City of Everett 00 21 13-6 February 2023 <br /> WPCF TFI Bar Screen Upgrades <br /> UP3770 <br /> I <br />