Laserfiche WebLink
I <br /> I <br /> powering bypass pumping with the inclusion of a back-up generator <br /> and automatic transfer switch supplied by the Contractor. See Section <br /> 01 50 00, Subsection 1.03.C, Bypass Pumping for the system <br /> requirement of bypass pumping operations. <br /> Q2 - What material is the 48" ALE pipeline? — There are no as-built drawings for <br /> this pipeline that indicate what material the pipe is. The City suspects <br /> the pipe is cement lined, concrete cylinder pipe; however, this has not <br /> been confirmed. <br /> PRE-BID MEETING AGENDA AND SIGN-IN SHEETS <br /> The agenda and sign-in sheets from the Pre-bid meetings held on February <br /> 23rd, 2023, and February 28th, 2023 are attached. <br /> I <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> I <br /> 1 <br /> 1 <br /> 1 <br /> Addendum 1 Page 2 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 <br />