My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> compartment <br /> p ent of the Recirculation/Bypass Flow Control Structure, <br /> including chipping out some existing concrete to fit the new gate <br /> frame. <br /> xi. Demolishing an existing slide gate and flap gate in the existing <br /> Recirculation/Bypass Flow Control Structure. <br /> xii. Fabricating and installing a new static weir assembly in the western <br /> compartment of the Recirculation/Bypass Flow Control Structure. <br /> b. Project Phasing I <br /> i. Please refer to specifications Section 01 32 11 <br /> ii. Phase 1 work— This work must be substantially complete by June <br /> 15th, 2023, and complete by June 30th, 2023. If this cannot be <br /> accomplished then this work may not start until November 1st, 2023 <br /> iii. Phase 2 work — This work can proceed in parallel with Phase 1 <br /> work. <br /> iv. Phase 3 work — Phase 1 must be completed prior to beginning <br /> Phase 3 work. <br /> c. Work Area <br /> i. Northeast corner of WPCF <br /> ii. Non potable water available at site <br /> iii. 120-volt single-phase receptacles at site <br /> iv. Contractor needs to provide a porta-potty <br /> d. Access <br /> i. Access site through WPCF Construction gate <br /> ii. Parking across 4th St, near WPCF IPT Building I <br /> e. Work Hours <br /> i. 0600-1730 I <br /> ii. Mon-Friday <br /> f. Schedule 1 <br /> i. Bid Opening — March 7th, 2023 @ 2:00 pm. <br /> ii. Bid Received at City Clerk's Office — 2930 Wetmore <br /> iii. Anticipated Notice to Proceed — 4/25/23 1 <br /> g. Work by Others <br /> i. WPCF may have other contractors working on site. I <br /> 4. Bid Documents <br /> a. Bid Form —Section 00 41 13 <br /> b. By-pass pipe can be bid as HDPE or Ductile Iron <br /> c. Geotech report is within the specifications <br /> d. Prevailing wages apply to this project <br /> e. Substantial completion is 335 calendar days <br /> 1 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.