My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
614 48TH ST SE 2023-05-23
>
Address Records
>
48TH ST SE
>
614
>
614 48TH ST SE 2023-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2023 9:42:49 AM
Creation date
5/22/2023 11:35:58 AM
Metadata
Fields
Template:
Address Document
Street Name
48TH ST SE
Street Number
614
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in <br /> Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 7/20/2022 7/20/2022 PLUMB 03-ROUGH JASON CORRECTION eTRAKiT Inspection Request <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> 7/18/2022 3:32 PM Serah Kiama <br /> Bathroom <br /> Contact Name:Serah Kiama <br /> Site Address:614 48TH ST SE <br /> Phone:2532303141 <br /> e-Mail:sarahkiamall@gmail.com <br /> (7/20/2022 12:09 PM JJM) <br /> jjm changed Inspection Type from PLUMB 07-OTHER to PLUMB 03-ROUGH IN <br /> (7/20/2022 12:10 PM JJM) <br /> -Previous corrections incomplete. <br /> 8/1/2022 8/1/2022 PLUMB 03-ROUGH JASON RESCHEDULE <br /> IN MORRISSEY ONLINE <br /> Notes: <br /> Bathroom <br /> Contact Name:Serah Kiama <br /> Site Address:614 48TH ST SE <br /> Phone:2532303141 <br /> e-Mail:sarahkiamall@gmail.com <br /> (8/1/2022 10:46 AM JJM) <br /> -Not ready per owner. <br /> 9/8/2022 9/8/2022 PLUMB 03-ROUGH JASON CORRECTION <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> sarahkiamall@gmail.com,253-230-3141 <br /> -Rework horizontal wet vent so lay drain ties in horizontally just downstream of toilet bend per UPC chapter 9.Use approved combo or wye fitting per <br /> UPC chapter 7.(Horizontal wet vent must take off from trap arm on the horizontal for system to work per design.)-Install missing nail plates on top and <br /> bottom plates per UPC.-Plug and pressurize shower riser before next inspection. <br /> 9/29/2022 9/29/2022 PLUMB 03-ROUGH JASON CORRECTION <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> PLUMB 03-ROUGH IN <br /> sarahkiama11@gmail.com,253-230-3141 <br /> -Bring all three bathrooms up to code.Based off 2018 UPC. Recommend licensed plumbing company to make repairs.-Too many corrections to list. <br /> 10/24/2022 10/24/2022 PLUMB 03-ROUGH JASON CORRECTION see notes <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> sarahkiama11@gmail.com,253-230-3141 <br /> -Cap off lay in half bath and fill waste through roof vent.-Connect kitchen drain downstream of shower trap arm for code approved horizontal wet vent <br /> in newly Re plumbed 3/4 bath.Fill waste and vent through roof vent.***All corrections per 2018 UPC chapter 7 and 9.*** Rough in will be partial <br /> approval as third bath will be remodeled later!! <br /> ti 1n <br /> Printed:Tuesday,09 May,2023 2 of 3 ,-i <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.