My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
614 48TH ST SE 2023-05-23
>
Address Records
>
48TH ST SE
>
614
>
614 48TH ST SE 2023-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2023 9:42:49 AM
Creation date
5/22/2023 11:35:58 AM
Metadata
Fields
Template:
Address Document
Street Name
48TH ST SE
Street Number
614
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 10/27/2022 10/27/2022 PLUMB 03-ROUGH JASON PARTIAL See Notes <br /> IN MORRISSEY APPROVAL <br /> Notes: <br /> SERAH 253-230-3141 <br /> serahkiamall@gmail.com <br /> -Far west 3/4 hall bath and far east 1/2 bath new rough DWV and water piping ok.(Third bath to be remodeled later). <br /> 11/17/2022 11/17/2022 PLUMB 03-ROUGH JASON APPROVAL see notes <br /> IN MORRISSEY <br /> Notes: <br /> 253-230-3141 <br /> sarahkianamll@gmail.com <br /> -3rd bath rough plumbing ok.Walk in shower.Toilet drain replacement. <br /> 1/9/2023 1/9/2023 PLUMB 08-FINAL JASON CORRECTION see notes <br /> MORRISSEY REQUIRED <br /> Notes: <br /> 253-230-3141 <br /> SARAH KIA MA 11 @ G MAI L.CO M <br /> -Half bath toilet and pedestal lay need to be caulked to the floor per the UPC 402.2 Joints-SE main bath lay has a leak from cold stop.Caulk shower <br /> escutcheon to wall.-NW main bath caulk toilet to floor.***Replace all flexible tubing with approved tubular traps and trap arms.Per the UPC.On all <br /> three lay sinks.Cannot use corrugated tubing for drainage.1005.1 General <br /> -Half bath toilet and pedestal lay need to be caulked to the floor per the UPC 402.2 Joints-SE main bath lay has a leak from cold stop.Caulk shower <br /> escutcheon to wall.-NW main bath caulk toilet to floor.***Replace all flexible tubing with approved tubular traps and trap arms.Per the UPC.On all <br /> three lay sinks.Cannot use corrugated tubing for drainage.1005.1 General <br /> 1/17/2023 1/17/2023 PLUMB 08-FINAL JASON APPRVD-PERMIT <br /> MORRISSEY FINAL <br /> Notes: <br /> 253-230-3141 <br /> SARAHKIAMA11@GMAIL.COM <br /> si <br /> Printed:Tuesday,09 May,2023 3 of 3 SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.