Laserfiche WebLink
Describe drainage flow paths (direction, location): <br /> Drainage flow paths down slope to the north. <br /> Are there Critical Areas?What are they and where are they located relative to your project? <br /> (Check with the Planning Division at planning caeverettwa.gov if you are unsure if the property is in <br /> close proximity to a Critical Area.): <br /> No. <br /> Task 2: Describe proposed project <br /> Describe your proposed project: <br /> Conditioned addition to a single family residence on north/northeast side. <br /> How will your project change the existing condition?: <br /> The footprint of the existing house will expand to the north in the area currently <br /> occupied by a wood deck. The house will also expand to the east in the area <br /> currently occupied by the gravel side drive. Gravel drive to the north of the <br /> addition will be removed (170 SF). <br /> Describe roofs, patios, driveways, or structures added: <br /> The footprint of the existing house will expand to the north in the area currently <br /> occupied by a wood deck. The house will also expand to the east in the area <br /> currently occupied by the gravel side drive. <br /> How will stormwater be managed in the final condition?: <br /> New conditioned area roof will feed to new downspouts at the northeast and <br /> northwest corners of the new roof. Water collected will discharge to splash <br /> blocks and infiltrate beyond (north). <br /> Describe how the project will affect existing drainage systems onsite or on adjacent properties <br /> or both: <br /> Additional water collected will be discharged/infiltrated on site per plans. <br /> Minimal to no net effect on systems and adjacent neighbor's properties. <br /> City of Everett Public Works F i° ? } <br /> Small Project Stormwater Site Plan Report for Projects in <br /> the Combined Sewer Area-April 2021 #� ,y s <br />