My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3201 56TH ST SW 2023-05-23
>
Address Records
>
56TH ST SW
>
3201
>
3201 56TH ST SW 2023-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2023 9:47:12 AM
Creation date
5/22/2023 11:47:21 AM
Metadata
Fields
Template:
Address Document
Street Name
56TH ST SW
Street Number
3201
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> November 8, 2021 <br /> Mr. Garin Schenk <br /> Architecture Studio of Everett <br /> 615 35th Street <br /> Everett, WA 98201 <br /> Email Address: garin@archstudioeverett.com <br /> RE: Owner: Chad and Whitney Mayer <br /> Job Address: 3201 56th Street SW <br /> Plan Check Number: B2110-017, First Building Review <br /> Dear Mr. Schenk, <br /> The proposed project has been reviewed for compliance with the provisions of the building codes <br /> adopted and amended by the state of Washington and the city of Everett. The comments below <br /> must be addressed before a permit can be issued. These comments address building issues only. <br /> Additional comments may be issued by the Public Works, Planning, and Fire departments. <br /> Code citations provided in the following review comments reference the Everett Municipal Code <br /> (EMC), the 2018 International Residential Code (IRC), 2018 International Building Code (IBC), and <br /> the 2018 Washington State Energy Code (WSEC). Amendments to the adopted building codes by <br /> Washington Administrative Code (WAC)Title 51 are incorporated into the referenced code citations. <br /> Citations provided in the comments reference the IRC unless noted otherwise. <br /> In order for the processing of your application to continue, the following documentation shall be <br /> submitted to Permit Services for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. Two copies of supplemental structural calculations (if appliable). <br /> Submittal documents should contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted building codes. Upon submittal of the revised documents, your <br /> application will be given priority and the review will recommence. <br /> Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.