My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
431 104TH PL SE 2023-10-26
>
Address Records
>
104TH PL SE
>
431
>
431 104TH PL SE 2023-10-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 9:32:09 AM
Creation date
5/22/2023 11:57:58 AM
Metadata
Fields
Template:
Address Document
Street Name
104TH PL SE
Street Number
431
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review Comments form City as of 9/17/21(B2109-020)_ <br />1. The proposed project scope -of -work states to demolish non -bearing walls. This cannot be confirmed <br />based on the information. A framing plan for the ceiling and roof framing should be provided to <br />confirm that no load -bearing walls are being demolished. <br />Sheet A0.1 Floor Plan - Existing is updated to include roof trusses information. <br />2. The proposed project involves the demolition of existing walls and the construction of new walls. The <br />plans should clearly show all work being performed. Recognized drafting standards should be used to <br />delineate between new and existing walls, including delineating existing walls to be demolished. All <br />demolition should be shown on the Existing Floor Plan. All new construction should be shown on the <br />New Floor Plan. <br />Updated in Sheet A0.1 Floor Plan. <br />3. Continuing with the previous comment, details for the construction of the new walls should be <br />included. The details should include the connections of the top and bottom framing plates to the <br />existing structure. <br />Please see A4.0 Details sheet. <br />4. The proposed project includes the demolition and construction of non -wall components, including but <br />not limited to doors, sinks, showers, and toilets. All demolition and new construction should be clearly <br />shown. <br />Sheet A0.1 Floor Plan - Existing is updated to include demolition information. <br />5. Smoke and CO alarms should be provided per IRC Sections R314 and R315. The locations of all alarms <br />should be shown on the plans. The alarms should be hardwired, interconnected, and provided with <br />back-up battery power as required. <br />Updated in A0.2 Floor Plan — New. <br />6. The proposed project includes relocated the gas furnace. This should be specified on both the existing <br />and new plans. The plans should specify seismic restraints. <br />Existing water heater will be relocated to garage. Furnace remains in the existing location. Sheet A0.2 <br />Floor Plan New is updated. <br />7. The bathrooms and kitchen should specify exhaust fans including the required rates per IRC Table <br />M1505.4.4(1). <br />Updated iri Sheet AO 2 Floor Plan - New. <br />8. The proposed project appears to include modifications to the north exterior wall to install a window <br />for the Master Bathroom. Structural details complying with the prescriptive requirements of the IRC <br />should be included. See IRC Chapter 6. Note that the exterior wall appears to be a load -bearing wall. <br />No window to be added in this project. Master bathroom window is to be eliminated. Sheet A0.2 <br />Floor Plan — New is updated. <br />9. Continuing with the previous comment, the required thermal rating for the window should be <br />specified per WSEC Table R402.1.1. <br />No window to be added. Master bathroom window is to be eliminated. Sheet A0.2 Floor Plan — New is <br />updated. <br />�I <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.