Laserfiche WebLink
Test and Balance Report <br /> H <br /> VAC <br /> ACP <br /> Date: 05/06/2023 Time: 16:001-1rs <br /> Site Information <br /> Address: 1130 SF Fyerett Mall Way <br /> Address: <br /> City Fyerett <br /> State WA Zip A8208 <br /> Construction Type ❑ New ❑ Existing ❑ Commercial ❑ Residential <br /> Testing Technician: Rnrlrign Ramirez Test Mode: E] Heating ElCooling <br /> Testing Method: ❑ Flow Hood ❑Traverse(Anemometer) ❑Traverse(Pitot Tube) ❑ Velocity/Grille Ak <br /> Test Instrument Brand: Alnnr Model: 6700F Date Calibrated: 05/02/2023 <br /> Test Instrument Serial Number: 801750 Air Temperature: 67 Altitude: 82ft/25m <br /> Room/ Duct Terminal Location Design Airflow Test 1 Final Test 2 Final Test 3 Final % Design <br /> 1 Rtu-6 Processing Room 370 348 355 362 99.6% <br /> 2 Rtu-6 Processing Room 370 352 357 368 99.7% <br /> 3 Rtu-6 Processing Room 370 382 378 375 100.40 <br /> 4 <br /> 0 <br /> 5 Rtu-6 Processing Room 370 372 372 372 1000 <br /> 6 Rtu-6 Processing Room 370 356 362 364 99.6% <br /> 7 Rtu-6 DMLP Office 200 249 235 221 100.9% <br /> 8 Rtu-6 DM Office 200 237 234 231 100.80 <br /> 9 Rtu-6 Return 200 252 248 236 100.9% <br /> 10 Rtu-6 Return 200 246 238 233 100.9% <br /> 11 <br /> 12 <br /> 13 <br /> 14 <br /> 15 <br /> 16 <br /> 17 <br /> 18 <br /> 19 <br /> 20 <br /> 21 <br /> 22 <br /> 23 <br />