Laserfiche WebLink
GENERAL NOTES D P <br /> a. CONTRACTOR TO FAMILIARIZE HIMSELF WITH THE SITE AND VERIFY EXISTING <br /> CONDITIONS PRIOR TO CONSTRUCTION AND ADJUST FOR ACTUAL FIELD CONDITIONS C <br /> AT NO EXPENSE TO OWNER.REPORT TO THE ARCHITECT AND OR ENGINEER ANY <br /> DISCREPANCIES WITH THE PLANS AND EXISTING CONDITIONS. <br /> b. SCHEDULE OF WORK:THIS CONTRACTOR SHALL BE REQUIRED TO FAMILIARIZE 1301 Solana Blvd. <br /> HIMSELF WITH THE PROPOSED WORK SCHEDULE&SHALL COORDINATE HIS WORK Bldg.1,Suite 1420 <br /> SCHEDULE WITH THE OTHER TRADES,SO THAT WORK PROGRESSES CAN BE PLANNED Westlake,TX 76262 <br /> IN A PROPER SYSTEMATIC FASHION TO AVOID ANY DUPLICATION OF EFFORT& 817-410-2858 <br /> RESULTANT DELAY OF PROJECT. <br /> W W W.DONPENN.COM <br /> c. PROVIDE OPERABLE HVAC SYSTEMS COMPLETE IN ALL RESPECTS AS CONTEMPLATED <br /> BY THE INFORMATION INDICATED ON THE DRAWINGS.IT IS NOT INTENDED THAT THE <br /> DRAWINGS&SPECIFICATIONS INDICATE EACH&EVERY ITEM OF INFORMATION <br /> NECESSARY FOR COMPLETE SYSTEMS BUT INDICATE SUFFICIENT INFORMATION FOR <br /> THE CONTRACTOR TO SECURE ADDITIONAL INFORMATION FROM OTHER SOURCES& <br /> PROVIDE ALL MATERIALS,EQUIPMENT&LABOR NECESSARY FOR COMPLETE <br /> INSTALLATIONS. <br /> d. ALL LABOR,MATERIALS&EQUIPMENT SHALL BE PROVIDED WITH ONE YEAR q %PoD ASq ��� <br /> GUARANTEE FROM DEFECTS. <br /> e. CUTTING&PATCHING:THIS CONTRACTOR MUST LAY OUT HIS WORK IN ADVANCE OF <br /> NEW CONSTRUCTION IN ORDER THAT UNNECESSARY CUTTING 8 PATCHING WILL BE <br /> AVOIDED.OPENINGS SHALL BE REUSED AS SHOWN AND ANY MODIFICATIONS TO ROOF <br /> O OPENINGS SHALL BE APPROVED BY THE LANDLORD,DONE BY THE LANDLORD'S '�J�A Rg 313632 Cs� <br /> 6 q I ROOFING CONTRACTOR AND PAID FOR BY THE CONTRACTOR. ONA 8� <br /> f. ALL ROOF CURBS/PENETRATIONS ARE TO BE INSTALLED IN STRICT ACCORDANCE WITH <br /> UH-1 THE EQUIPMENT MANUFACTURER'S DETAILS.ALL REQUIRED ROOFING SHALL BE BY 10/13/2022 <br /> ELECTRIC THE LANDLORD'S DESIGNATED ROOFING CONTRACTOR AS REQUIRED TO MAINTAIN <br /> ROOM Si 70 THE WARRANTY AND INTEGRITY OF THE ROOF. <br /> g. PROVIDE REQUIRED STRUCTURAL SUPPORT FOR ANY NEW ROOF MOUNTED OR CONTRACTOR SHALL VERIFY ALL <br /> SUSPENDED HEATING,VENTILATION,OR AIR CONDITIONING EQUIPMENT AS REQUIRED. CONDITIONS AND DIMENSIONS AT <br /> COORDINATE SIZES AND PLACEMENT OF UNITS WITH THE LANDLORD. THE JOB SITE AND NOTIFY THE <br /> h. ALL DUCTWORK,HANGERS,DAMPER CONSTRUCTION,SEAMS,INSTALLATION,ETC., ARCHITECT OF ANY DIMENSIONAL <br /> SHALL CONFORM TO THE STANDARDS AS ADOPTED BY A.S.H.R.A.E.&SMACNA.ALL ERRORS, OMISSIONS OR <br /> 0 <br /> 81 10"0WORK SHALL CONFORM TO ALL APPLICABLE LAWS,RULES&REGULATIONS& DISCREPANCIES BEFORE BEGINNING <br /> O RECOMMENDATIONS OF LOCAL BUILDING DEPARTMENT,NATIONAL BOARD OF FIRE OR FABRICATING ANY WORK. DO NOT <br /> UNDERWRITERS,N.F.P.A.,&SHOPPING CENTER GENERAL SPECIFICATIONS.ALL SCALE DRAWINGS. <br /> 10"0 DUCTWORK SHALL BE SHEET METAL CONFORMING TO SMACNA STANDARDS FOR LOW <br /> S7 430 PRESSURE DUCTWORK&A.S.H.R.A.E.STANDARD 90-75. <br /> R7 10 0 10"0 10"0 i. SUPPLY DUCTWORK INSIDE BUILDING SHALL BE INSULATED WITH R-8,25'ALUMINUM <br /> ___ R1150 <br /> O 9 n ❑ ❑ -_ _ BE INSTALLED IN CONCEALED SPACE ABOVE CEILINGS. ON BALL DUCTWORK SHALL <br /> FOIL FACED FIBERGLASS BLANKET OVERLAPPED&WIRED <br /> 12' NEW ----- O S1 1 I. DUCT SYSTEM SHALL BE SEALED TO A LEAKAGE RATE NOT TO EXCEED 6 PERCENT <br /> S1 1 00 S1+000 S1 370 00 10 12" ERV-1 20 22 11 THE NOMINAL AIRFLOW RATES,AND SHALL BE CONFIRMED THROUGH FIELD <br /> 0 <br /> Si MGR. E1 CO T ROO Si 1 JAN 12'0 VERIFICATION AND DIAGNOSTIC TESTING. <br /> - OFFIC Ei ° <br /> D Si 0 Si 50 E+100, 50 Ei k. PROVIDE RETURN AIR FILTERS AT HVAC UNITS ON ROOF,NOT AT RETURN AIR GRILLE <br /> F CE _ q0 IN SPACE. <br /> 2dx20, +0„ 112"0 R710" _____- ••0 6�0 <br /> 20"0 00 EHE EH-3 00„ Si 5 MEN'S I. ITIS THE OWNER'S RESPONSIBILITY TO CONTRACT WITH A COMMISSIONING <br /> R1 1 1 "0 1 70„0' 4 � AUTHORITY TO COMPLY WITH LOCAL CODES. <br /> 0 0 50 <br /> PROCESSING D j S+ p L.P. i 25 RTU-7 m. PROVIDE ARCHITECT WITH THREE(3)COPIES OF AIR BALANCE REPORT.INSTRUCT <br /> i' ROOM 10"0 NEW I I'''• , 81 R - z 10 0 10" 14 O Ei 40 OWNER IN USE OF EQUIPMENT.AIR BALANCE REPORT TO BE AN INDEPENDENT <br /> S7 350 RTU-6 I 3 \` 10"0 ° qp' S 0 CASH R R+ TESTING AGENCY.AIR BALANCE TEST REPORT TO BETAKEN IN THE LATE AFTERNOON <br /> E1 500 Ri (X E 10" S 170 �� WITH THE FOLLOWING TEMPERATURE READINGS DOCUMENTED(IN ADDITION TO CFM) <br /> IQo 24X24 O 17 E+ 00 11 WOMEN'S 1.)TEMPERATURE OF AIR LEAVING EACH CEILING DIFFUSER,2.)TEMPERATURE OF AIR <br /> L--- \ LEAVING HVAC UNIT,3.)TEMPERATURE OF OUTSIDE AIR AT HVAC UNIT,4.) <br /> / <br /> RTU-6(D6 14x1 \ TEMPERATURE OF AIR WITHIN SALES AREA(ATTHERMOSTAT). <br /> RTU-4 EH-2Gr <br /> \ <br /> S+ °" FIELD VERIFY ALL CONDITIONS <br /> E1450 E1 450 ' \ E 450 _—__— RTUS \ <br /> \ DESIGN DRAWINGS ARE SCHEMATIC.THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO <br /> ' E 450 1 450 I \ BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD CONDITIONS.THIS <br /> CONTRACT SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR FIELD <br /> / / \ NEW \ MODIFICATIONS DUE TO EXISTING CONDITIONS. <br /> RTU-7 <br /> / 1 \ THE CONTRACTOR SHALL CONTACT THE ARCHITECT,ENGINEER OR OWNER PRIOR TO <br /> I \ BIDDING FOR INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN AND INCLUDE IN HIS <br /> 16x14 +8x 8 2x20 4x12 11 BID ALL COSTS TO MEET THE DESIGN INTENT.CLARIFICATIONS MADE BY THE ARCHITECT, <br /> I ENGINEER OR OWNER AFTER BIDDING WILL BE FINAL AND SHALL BE IMPLEMENTED AT <br /> I 1 CONTRACTOR'S COST. <br /> I I 1 R 0x20 I <br /> I --- --- I BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL CODES AND <br /> NEW I ORDINANCES AND SHALL INCLUDE IN THEIR BIDS THE COSTS FOR ALL WORK INSTALLED IN <br /> 1 2 — II STRICT ACCORDANCE WITH GOVERNING CODES.THE PLANS AND SPECIFICATIONS NOT <br /> l — — — WITHSTANDING,THE CONTRACTOR SHALL ALERT ARCHITECT,ENGINEER OR OWNER OF O <br /> "0 R+ ° ° I 12 E1 „0 E7 , (EIM. ANY APPARENT DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN INTENT, <br /> I <br /> x2e <br /> S2 L_ _ J I Qf N <br /> NEW n <br /> S <br /> 3 — — RTU-5 13400 ; KEYED NOTES O <br /> 2 cu <br /> NEW ROOFTOP UNIT.PROVIDE AND INSTALL FULL ROOF CURB AND FRAME FOR NEW O co <br /> RTU AND CURB.PROVIDE NEW ROOF OPENING AND FLASHING AS REQUIRED ABOVE C..) <br /> / ROOF,COORDINATE WITH GENERAL CONTRACTOR.COORDINATE WITH EXISTING O <br /> STRUCTURE AND OVERHEAD UTILITIES AND ADJUST RTU LOCATIONS AS REQUIRED. co <br /> MECHANICAL CONTRACTOR TO PROVIDE DUCT ROUTING&DROPS FROM RTU DOWN <br /> / TO CEILING DROP BOX DIFFUSER.PROVIDE TRANSITION FROM RECTANGULAR TO <br /> ROUND DUCT IF REQUIRED.COORDINATE WITH MANUFACTURER'S REQUIREMENTS <br /> g ■ ■ ■ __ E <br /> SMOKE DETECTOR MOUNTED IN RETURN DUCT INTERLOCKED WITH SUPPLY FAN AS Ll- <br /> REQUIRED <br /> .LREQUIRED BY CODE.FAN SHALL SHUTDOWN UPON DETECTION OF SMOKE. <br /> THERMOSTATS TO BE MOUNTED ON WALL AT 48"AFF. <br /> EXTEND HORIZONTAL RETURN DUCT AND TERMINATE WITH FULL SIZE 1/4"WIRE <br /> NEW \ MESH SCREEN. <br /> J DOAS-1 \\ O 12x12 DUCT UP THROUGH CEILING TO EF-2 ON ROOF.SEE M2.1 ROOF PLAN <br /> O 14x14 DUCT UP THROUGH CEILING TO EF-30N ROOF.SEE M2.1 ROOF PLAN <br /> O SUPPLY AND RETURN DUCTS RUN TOGETHER TO CONCENTRIC DIFFUSER. <br /> 1 <br /> I 1 12"0 ERV-1 EXHAUST DUCT UP TO ROOF. <br /> I NEW i 10 12"0 ERV-1 O/A INTAKE DUCT UP TO ROOF. <br /> I RTU-2 I SALES <br /> I 1 11 COORDINATE WITH ARCHITECT FOR UNDERCUT OF DOOR MINIMUM 1",MAXIMUM 1-114". <br /> NEW <br /> Mel <br /> 2x22 I RTU-3_ _ <br /> I I 2x22 I I 4°° " NOVAR SYSTEM NOTES <br /> I I <br /> I 3 l 000 28X18 <br /> 28x1 <br /> (R1x I RRI, ___ — NOVAR INTERFACE SUMMARY(REFER TO TJX SPECIFICATIONS FOR DETAIL > <br /> 11 500 5 3 — S7 5 S1 50 INFORMATION.) <br /> 11 I I 1. GENERAL CONTRACTOR <br /> 1 I Q <br /> \ 36x18 6x18 I 1.1. PROVIDE 4'X8'PLYWOOD BACKBOARD IN ELECTRIC ROOM FOR NOVAR TO <br /> 2\ 4 I I MOUNT THEIR EQUIPMENT.PHONE AND ETHERNET JACKS FOR THE NOVAR <br /> RTU-3 CONTROLLER WILL ALSO BE LOCATED ON THIS BOARD BY SEPARATE TJX w <br /> \\ R U-1 1 1 / I <br /> VENDOR. <br /> \ RTU-2 \ I I NEW <br /> \ RTU-1 / 2. MECHANICAL CONTRACTOR Q w o <br /> I I <br /> \ � 2.1. MOUNT 2X4 J-BOX WITH CONDUIT(WIREMOLD IF EXPOSED IN FINISHED O � ro <br /> / AREAS)AT LOCATIONS DESIGNATED ON NOVAR CONTROLS SITE SPECIFIC O p o' <br /> \ 14x14 / PLANS.THE J-BOXES ARE SHALL BE MOUNTED 60"AFF EXCEPT IN FITTING Q w Q <br /> / ROOM LOCATIONS WHERE J-BOXES SHALL BE MOUNTED 84"AFF.ON SALES rf Z, FLOOR J-BOXES SHALL BE V 3 3 <br /> \ \ / OFSTORE. <br /> ON BACK SIDE OF COLUMNS WHEN LUw N <br /> VIEWED FROM FRONTO w <br /> 2.2. PROVIDE PERMANENT STRANDED 18/2 AWG NON SHIELDED CABLE(18/81F O W 0 w <br /> THE RTU IS EQUIPPED WITH A CO2 SENSOR)FROM EACH ROOFTOP UNIT TO = w - w <br /> THE NOVAR ETM(T-STAT)LOCATION SHOWN ON THE NOVAR PLAN THAT <br /> 51470 51470 S4470 5+470 51470 SUPERSEDES ANY MECHANICAL PLAN LOCATIONS.ALL CONTROL DEVICES <br /> \ i SHALL BE APPROPRIATELY IDENTIFIED AND PERMANENTLY ATTACHED. TENANT FINISH OUT <br /> EVERETi, WA <br /> 12"0 5112 5112 Y 12^0 S 12 2.3. TEMPORARY THERMOSTATS SHALL BE INSTALLED NEAR THE ROOFTOP RTS_��SO <br /> 500 5DO UNITS. <br /> 16x1 1 20x1 x 2.4. HVAC EQUIPMENT SHALL HAVE HAD MANUFACTURER'S RECOMMENDED <br /> STARTUP PROCEDURE PERFORMED AND BE OPERATIONAL IN ALL MODES <br /> BEFORE ARRIVAL OF NOVAR CONTROLS REPRESENTATIVE FOR FINAL REVISIONS: <br /> S1 20 Si 2"0 5712" S1 20 NOVAR INSTALLATION.470 No. Description Date <br /> S7 2"0 3. ELECTRICAL CONTRACTOR 1 CLIENT COMMENTS 09.23.22 <br /> 3.1. REFER TO ELECTRICAL PLANS FOR REQUIREMENTS AND COORDINATION <br /> INFORMATION <br /> ® V ST U E <br /> Ell11 0 ❑ <br /> IMPORTANT NOTICE: <br /> 1 STANDARD LEAD TIME FOR YORK RTU HVAC EQUIPMENT IS FOUR(4)WEEKS <br /> MANUFACTURING PLUS ONE(1)WEEK TRANSPORTATION DEPENDING ON THE LOCATION IN <br /> THE 48 STATES.ANY NON STANDARD OPTION MAY ADD TO THE STANDARD <br /> MANUFACTURING LEAD TIME AND WILL BE CONFIRMED AT PLACEMENT OF ORDER.HVAC <br /> EQUIPMENT WITH FACTORY TECHNICOAT COATING OF CONDENSER COILS WILL HAVE AN <br /> ❑ ❑ ELEVEN(11)WEEK LEAD TIME. <br /> TJX COMPANIES <br /> PLAN REVIEW <br /> A.0 OA A.6 BO B.5 CO C.2 DO O O X etlasNotetl THERMOSTAT/SENSOR NOTE: <br /> R-i- -- <br /> Revise&Resubmit ALL SENSORS AND THERMOSTATS PROVIDED BY NOVAR CONTROLS.FINAL LOCATIONS AND ---------- ------ <br /> ELEVATIONS PER NOVAR CONTROLS PLANS. <br /> Re New is for conformance to the TJX MECHANICAL CONTRACTOR SHALL PROVIDE TEMPORARY THERMOSTATS FOR UNIT ---- ------ <br /> s O ifi-ti E3 Criteria documents(plane a OPERATION FOR SPACE TEMPERING.THERMOSTAT SHALL BE LOCATED NEAR RETURN AIR <br /> p mspo tion).Thisreview COM not relieve <br /> responsibility of the TJX COMPANIES LOCATION <br /> criteria documents and specifications ---- ------ <br /> 8j,. joshandemon <br /> Date. 10/26/2022 MECHANICAL CONTRACTOR TO FURNISH AND INSTALL ADAPTACURBS WHEN REPLACEMENT PROJECT NO: 22-0422 <br /> OF EXISTING ROOFTOP EQUIPMENT IS REQUIRED.CONTACT NATIONAL ACCOUNTS FOR DRAWN BY: JAS <br /> INFORMATION. <br /> REVIEWED BY: BA <br /> ORIGINAL ISSUE: 09.09.2022 <br /> SHEET TITLE: <br /> MECHANICAL <br /> FLOOR PLAN <br /> SHEET NUMBER: <br /> SCALE I V 1 2.0 <br /> 1 MECHANICAL FLOOR PLAN 1 =70 <br />