Laserfiche WebLink
Lumio <br /> SMART ENERGY TODAY <br /> (SET) <br /> 1550 DIGITAL DR,LEHI,UT <br /> 84043,USA <br /> SYSTEM INFO <br /> (13)Q CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> (400W) <br /> (13)ENPHASE <br /> IQ8PLUS-72-2-US(240V) <br /> DC SYSTEM SIZE:5.200 kWDC <br /> ■■ ' SM SOLAR APPENDIX C ■■ SOLAR CODE COMPLIANCE NOTES : E <br /> AC SYSTEM SIZE:3.900kWAC <br /> as■ MOUNT UNIVERSAL�AP�ENDCLAMP INSTALLATION PAGE ��■ MOUNT INSTALLATION PAGE <br /> ---------------------------------------------------------------------------------------------------------------------------GUIDE--:-------- -------- --------------------------------------------------------------------------------------------------------------------------GUIDE-:-------- - -------- <br /> SYSTEM LEVEL FIRE CLASSIFICATION REVISIONS <br /> The system fire class rating requires installation in the manner specified in the SOLARMOUNT Installation Guide.SOLARMOUNT has been classified to the system DESCRIPTION DATE REV <br /> ® level fire portion of UL2703. SOLARMOUNT has achieved system level performance for steep sloped roofs.The fire classification rating is only valid on roof pitches <br /> greater than 2:12(slopes 3 2 inches per foot,or 9.5 degrees). The system is to be mounted over fire resistant roof covering rated for the application.There is no <br /> required minimum or maximum height limitation above the roof deck to maintain the system fire rating for SOLARMOUNT.Module Types,System Level Fire Ratings, <br /> _ and Mitigation Requirements are listed below: <br /> E- RaRType Module FireTypas System laid Fire Rating Rall Direction Module MMgation <br /> 7��1 u ONantatfort Required <br /> Standard&HD Raps 1,2,3 with Metal Frame,10 with Metal Class A.Class B&Class C East-West Landscape OR Portrait None Required PROJECT NAME&ADDRESS <br /> sr M1N Frame,l9,22,25,29,&30 <br /> - - - North-South Landscape OR Portrait None Required <br /> Light Ralt 1&2 Class A,Class B&Class C East-West Landscape OR Portrait None Required <br /> North-South Landscape OR Portrait None Required <br /> 1.Position clamp to align T-bolt with rail 2.Rotate clamp clockwise 2/3 of a turn S.Place module at least 3/4'from end of 4.While applying pressure to hold the Standard,Ligh4& 4&S Class A.Ctass8&Class C East-West Landscape OR Portrait Trim Installation per Solar <br /> slot.Lower clamp and Insert T-bolt into to engage T-bolt inside rail slot, rail and position clamp against module clamp against the module,push down on M <br /> rail slot. frame the module side of the clamp cap. HD Ralf North-South Landscape OR Porton Mount InsWllatbn Guide CN <br /> - - - - N <br /> This racking Wstem mdf be used to ground andror mourn a P'i module eompiying with UL1703 or UL61730 Dnly wizen rhe specific module rias reen to;waiEc ren 00 <br /> grounning aMror mouutrny in rumpllanct•witn Lir Inth~1 instructions. CA <br /> UL2703 CERTIFICATION MARKING LABEL UNIRAC >Q O <br /> Unirac SOLARMOUNT is listed to UL 2703.Certification marking is embossed on all mid clamps as shown.Labels with /t z <br /> additional information will be provided.After the racking system is fully assembled,a single label should be applied I the S�.a W CD <br /> r , SOLARMOUNT rail at the edge of the array.Before applying the(abet the comers of the label that do not pertain to the V J <br /> system being installed must be removed so that only the installed system type is showing. C 4 US = U W O <br /> a n/ <br /> r 50 mm 57&11 mit 55 mm Ni liE�inv c:WCOi AruuW��.PwCee:WOO 9W..r•i5 Vitibie,bW not outwalo(at 1,1: 66909 r, Z i-t- c) <br /> `JLL LLI <br /> LL.I <br /> LL. W W O <br /> to mm Kir^m as mm - > .. <br /> - Z Q *k <br /> S.When the cap contacts the module 6.Tighten bolt and torque to 15 It-lbs. 7.Confirm clamp is engaged in correct module height position and that the top of the � a <br /> frame,release and it will re-engage to cap is sitting level with the module frame. O Q <br /> the clamp base. <br /> id <br /> NOTE:When installing 46mm modules,loosen bolt by 1 turn before positioning clamp <br /> against module frame.Do not force clamp onto module frame as this may damage the iro —- <br /> bonding pin, y��.;_ �� W <br /> SM STANDARD RAIL _"""� ��'/ SM LIGHT RAIL <br /> CD <br /> LID <br /> Lf7 <br /> DATE: 11/4/2022 <br /> SHEET NAME <br /> EQUIPMENT <br /> SPECIFICATIONS <br /> SHEET SIZE <br /> ANSI B <br /> 11" X 17" <br /> SHEET NUMBER <br /> PV-18 <br />