Lumio
<br /> SMART ENERGY TODAY
<br /> (SET)
<br /> 1550 DIGITAL DR,LEHI,UT
<br /> 84043,USA
<br /> SYSTEM INFO
<br /> (13)Q CELLS
<br /> Q.PEAK DUO BLK ML-G10+
<br /> (40OW)
<br /> (13)ENPHASE
<br /> IQ8PLUS-72-2-US(240V)
<br /> DC SYSTEM SIZE:5.200 kWDC
<br /> ,N SOLAR BONDING CONNECTION GROUND PATHS " ■ .;; SM SOLAR ENDCLAMP, FIRST MODULE : ■ AC SYSTEM SIZE:3.900kWAC
<br /> ■� MOUNT INSTALLATION GUIDE PAGE ■■ MOUNT INSTALLATION GUIDE PAGE
<br /> -
<br /> ------_-------------------------------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------------------------------------
<br /> REVISIONS
<br /> 4 Aro `_t HGF�\� O © © I DESCRIPTION DATE REV
<br /> Ze
<br /> 110a11FFq� FR9MF © gpa SF-aF`ptE N rr%
<br /> O't'O ROS � Ol ra
<br /> /Nc r GapMir
<br /> PROJECT NAME&ADDRESS
<br /> BONDING MIDCLAMP ASSEMBLY BONDING MIDCLAMP ASSEMBLY BONDING RAIL SPLICE BAR RAILTO L-FOOTvr/BONDING T-BOLT INSTALL MODULE END CLAMPS:The End INSTALL END CLAMPS ON RAIL: POSITION END CLAMPS: NOTE:To assist insertion of clamp into <
<br /> Spil g Hardware creates bond between splae serrated flange no removes Lfom enodizahon clamp is supplied as an assembly with a 1/2' Slide end clamp on to rail by Slide end clamp assembly rail slot,Pressure may be applied to
<br /> ®Aluminum mid clamp with stainless steel bonding pins that pierce module frame Q bar and each rad section ©to bond LFoot to stainless steel T-Dolt D
<br /> anodization to bond module to module through clamp hex head bolt that is accessible at the ends of engaging the two t-guide brackets on to rail until bolt head top or side of bracket as shown.Do
<br /> Aluminum splice Da+spans across ra,l gap to Serrated T-bolt head penetrates ail anodization
<br /> V create ra,l to rail bond.Rail on at least one Side grounded rails.The clamp should be installed on the with the top slot of the rails. engages with end of rail tial force clamp into rail by pushing trj
<br /> Stainless steel nut bonds aluminum damp to stainless steel T-bolt m bond T-Dolt.no,and L-root ro
<br /> of splice wnl be grounded SM rail rails prior to installing end modules. boU is extended as far as possiule End clamps are positioned on on bolt with excessive force O
<br /> Serrated T-bolt head penetrates rail anodization to bond T-bolt,nut,clamp,and - so that clamp is positioned at max, rails prior to the first end N
<br /> modules to SM rail OO
<br /> distance from end of rail, module and prior to the last O
<br /> end module. Q O
<br /> O
<br /> E Z W
<br /> .. ru�I,urwrrAirtve ., _. _ 2—i J O
<br /> WCA wAs1R.R - - Ot. , O
<br /> 4— - N-- r BONDING ' act 01%l a V o �b r, ' -_I W H l()
<br /> AkigF
<br /> T-BOLT Sats` .a o. 2 U O
<br /> E A D g \>✓F U z W00
<br /> •SVSIIM BONDING BONDING RAIL �F�RO �'\ U) W > L0
<br /> OUND �.7 MICROINVERTER SPLICE BA0. ©' �N/
<br /> ♦ MOUNT - - •� LLJ 0 W
<br /> / - WEEBLUG(OR ILSCO LUG) ® LL W W O
<br /> 14—1/2' Z Q
<br /> BONDING MICROINVERTER MOUNT RACK SYSTEM GROUND INSTALL FIRST MODULE: ENGAGE CLAMP:While holding module in position and with Z W Z
<br /> Mex nut with a
<br /> cDlrn'IOCk washer bonds mHJI wEEB washer dimples pierce endued tall to Install the first end module flange in full contact with rail,rotate end clamp bolt until for hese appearance, W
<br /> 4 microinverter flange to stainless steel T-bolt a create bond between rad and position module Rush IY
<br /> BONDING MiDCLAMv I onto rails with the flange of clamp engages with flange to provide clamp force. with ends of rails.Rails O Q
<br /> 4 tobnSerrated T-bolt head penetrates unpduation
<br /> ASSEMBLY - — Solid copper mreconneaedto lug isromedto the module frame positioned To ensure bolt is not over-torqued,use low torque setting should not extend more S
<br /> to bond T-Do 1l land L- . to grounded © ovide brut s L
<br /> AJ �- •�� Slat rani,,.-,_�,•,.,,,,,-„ ,,,,I,_„,_• m system ground connection. between end clamps an ends on drill or If using an impact driver,stop rotation as soon as �s than 1R•beyond module.
<br /> rrud„trin vtor,sn,.vn,—.*,m.n,n— Module must be fully
<br /> RAILTOLFOOr aaooroe.pm,nrArw.rwr.,.til.'wry.rNu �Iw��r.-..nT+sNrfta of rails. impaRactionOfdriverbegins. supported by rails and LLI
<br /> w/BO�IONNG 7-BOLT ,-n;u jE VALLIE(See t.._. r.,.,.��,'1.-;0� ... �� cannot overhang ends
<br /> End clamp bolt to 5 ft-lbs.No anti-seize of rails.
<br /> r—
<br /> O
<br /> U')
<br /> In
<br /> DATE: 11/4/2022
<br /> F SHEET NAME
<br /> EQUIPMENT
<br /> LSPECIFICATIONS
<br /> SHEET SIZE
<br /> ANSI B
<br /> 11” X 17"
<br /> SHEET NUMBER
<br /> PV-19
<br />
|