Laserfiche WebLink
Lumio <br /> SMART ENERGY TODAY <br /> (SET) <br /> 1550 DIGITAL DR,LEHI,UT <br /> 84043,USA <br /> SYSTEM INFO <br /> (13)Q CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> (40OW) <br /> (13)ENPHASE <br /> I08PLUS-72-2-US(240V) <br /> DC SYSTEM SIZE:5.200 kWDC <br /> SM■■ : SOLAR STANDARD SYSTEM GROUNDING ' ■ �• SOLAR APPENDIX C ■ 4C SYSTEM SIZE:3.900kWAC <br /> on■ MOUNT INSTALLATION GUIDE PACE an MOUNT UNIVERSALAF MIDCLAMP INSTALLATION GUIDE : PACE <br /> --------------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------------- <br /> REVISIONS <br /> WEEBLUs DESCRIPTION DATE REV <br /> ----------- <br /> -__-_— ,Single Use Only i„„ <br /> i <br /> PROJECT NAME&ADDRESS <br /> ONLY ONE LUG PER ROW OF MODULES: % i i <br /> Only one lug per row of modules is r <br /> WEEBLUGCONDUCfOR-UNIRAC P/N 0080025: �- <br /> required. See Page F for additional lugs �— _ �� Apply Anti Seize and insert a bolt in the aluminum rail and through the clearance hole <br /> required for expansion joints. = in the stainless steel flat washer. Place the stainless steel flat washer on the bolt, <br /> --� oriented so the dimples will contact the aluminum rail Place the lug portion on the 1.Position clamp to align T bolt with rail 2.Rotate damp clockwise 2/3 of a tum 3.Slide clamp into position against 4.Place second module. <br /> bolt and stainless steel flat washer.Install stainless steel flat washer,lock washer and slot.Lower clamp and insertT-bolt into to engage T-bolt inside rail slot. module. O <br /> nut.Tighten the nut until the dimples are completely embedded into the rail and lug. rail slot CN <br /> TORQUE VALUE 10 It los.(See Note on PG.Ai <br /> See product data sheet for more details,Modet No.WEEB-LUG•6., <br /> Q O <br /> Z <br /> GROUNDING LUG MOUNTING DETAILS: O <br /> Star Waseer le -�_j"< <br /> Details are provided for both the WEEB and Ilsco products.The WEEBLug has a stnyle use Only �.> W C) <br /> grounding symbol located on the lug assembly.The Ilsco lug has a green colored _ __I <br /> set screw for grounding indication purposes.Installation must be in accordance lopf' rr W W O <br /> with NFPA NEC 70,however the electrical designer of record should refer to the = Z � O <br /> latest revision of NEC for actual grounding conductor cable size. ttaMitaAtmep,,, L JAq: W W 00 <br /> Requued II not using approved integrated grounding uutruinvetel i i.a..0 canduam 1 w O0 <br /> I,u,p,e W the toll ^ <br /> It,AWG:S5in it 1 W f/J � <br /> 5 AWG :5 in-tln LL W <br /> LLI GROUNDING LUG-BOLT SIZE&DRILL SIZE � ' > O <br /> GROUND LUG BOLT SIZE DRILL SIZE ZQ <br /> ILSCO LAY-IN LUGCONDLKTOR-UNIRAC P/N 008009P:Alternate Grounding Lug W Z <br /> WEEBLug 1/4- WA-Place in Top SM trail Slot Drill,deburr hole and bolt thru both rail walls per table. 5.Tighten bolt and torque to 15 ft-lbs. NOTE:If excessive force is applied in LLJ 0� 0- <br /> ASCO Lug x10-32 7/32' TORQUE VALUE S R lbs.(See Not, step 2,the cap may over-rotate causing O Q <br /> See ILSCO product data sheet for more details,Model No.GBL-4DIIL it to be mis-aligned with the module <br /> Torque value depends on conductor size. frame.If this occurs,keep rotating the <br /> See product data sheet for torque value. cap clockwise until it returns to the W <br /> NOTE:ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION original position. <br /> O <br /> Lf) <br /> tf) <br /> DATE: 11/4/2022 <br /> F SHEET NAME <br /> EQUIPMENT <br /> LSPECIFICATIONS <br /> SHEET SIZE <br /> ANSI B <br /> 11rt X 17" <br /> SHEET NUMBER <br /> PV-20 <br />