Laserfiche WebLink
Contents <br />PROJECTOVERVIEW.............................................................................................................................................1 <br />METHODOLOGY......................................................................................................................................................3 <br />STORMWATERNARRATIVE................................................................................................................................3 <br />EXISTINGCONDITIONS..............................................................................................................................................3 <br />DOWNSTREAMANALYSIS..........................................................................................................................................4 <br />SITESOILS.................................................................................................................................................................4 <br />PROPOSEDCONDITIONS.............................................................................................................................................4 <br />PROPOSED STORMWATER FACILITIES........................................................................................................................4 <br />EROSION AND SEDIMENTATION CONTROL...................................................................................................8 <br />ELEMENT # 1: PRESERVE VEGETATION/MARK CLEARING LIMITS............................................................................. <br />8 <br />ELEMENT #2: ESTABLISH CONSTRUCTION ACCESS...................................................................................................8 <br />ELEMENT #3: CONTROL FLOW RATES......................................................................................................................8 <br />ELEMENT #4: INSTALL SEDIMENT CONTROLS..........................................................................................................8 <br />ELEMENT #5: STABILIZE SOILS.................................................................................................................................8 <br />ELEMENT #6: PROTECT SLOPES................................................................................................................................8 <br />ELEMENT #7: PROTECT DRAIN INLETS..................................................................................................................... <br />8 <br />ELEMENT #8: STABILIZE CHANNELS AND OUTLETS.................................................................................................8 <br />ELEMENT #9: CONTROL POLLUTANTS......................................................................................................................8 <br />ELEMENT # 10: CONTROL DEWATERING................................................................................................................... 8 <br />ELEMENT #11: MAINTAIN BMPS..............................................................................................................................9 <br />ELEMENT # 12: MANAGE THE PROJECT..................................................................................................................... 9 <br />ELEMENT # 13: PROTECT LOW IMPACT DEVELOPMENT BMPS.................................................................................9 <br />ON -SITE STORMWATER MANAGEMENT.........................................................................................................9 <br />CONVEYANCE..........................................................................................................................................................9 <br />OPERATIONS AND MAINTENANCE....................................................................................................................9 <br />CONTACT INFORMATION FOR THE RESPONSIBLE PARTY <br />....................................................................10 <br />Figures <br />FIGURE1. VICINITY MAP.....................................................................................................................................2 <br />FIGURE 2A. EXISTING DRAINAGE BASIN........................................................................................................5 <br />FIGURE 2B. DEVELOPED DRAINAGE BASIN ...................................................................................................6 <br />FIGURE 2C. DOWNSTREAM MAP.......................................................................................................................7 <br />Appendices <br />APPENDIX A - WEB SOIL SURVEY <br />APPENDIX B - MAINTENANCE GUIDELINES <br />Stormwater Site Plan i 2, <br />1216 Broadway Surface Parking Lot <br />