Laserfiche WebLink
John Bertrand • <br /> From: Andrew Huang <br /> Sent: Tuesday,April 20, 2021 8:13 AM <br /> To: CHRIS.MUSCOLO@GMAIL.COM; DMYOUNGBLUT@GMAIL.COM; <br /> christiamrine@gmail.com <br /> Subject: Everett B2103-087 <br /> Christi, <br /> I'm the public works reviewer for your project at 2119 Lombard Ave. Your project is in the combined sewer area. Since <br /> the net new hard surface sf is more than 200, you will need to demonstrate conformance with flow control. See <br /> screenshot of DCSS Section 6-10.1(1), also linked below. <br /> Please provide a stormwater report to demonstrate compliance with the City's flow control requirements. In other similar <br /> projects, I usually see people hire a registered civil engineer to prepare this report. <br /> Thanks, <br /> 6-10.1(1) FLOW CONTROL <br /> Projects shall employ Flow Control BMPs in accordance with the following t <br /> requirements to reduce the impacts of stormwater runoff from hard surfaces and lan <br /> Thresholds <br /> The following projects require construction of Flow Control BMPs to achieve the F <br /> Standard. If a project meets any of the following thresholds, Flow Control BMPs <br /> proponent must demonstrate that the project does not meet any of the following th <br /> BMPs to not be required. <br /> • Projects that have a total of 200 square feet or more of net new impervious <br /> • Projects that convert 1/4 acres or more of native vegetation, pasture, sort: <br /> non-native vegetation to lawn or landscape. <br /> 1 <br />