My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
423 ROCKEFELLER AVE 2023-05-31
>
Address Records
>
ROCKEFELLER AVE
>
423
>
423 ROCKEFELLER AVE 2023-05-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2023 11:21:21 AM
Creation date
5/31/2023 11:19:14 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
423
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> HNLehtinen <br /> Engineering <br /> 4120 Hoyt Ave. rr-a <br /> Everett, WA 98203 <br /> (425) 252-2373 OCT J 0 2020 <br /> To:City of Everett CITY OF E V E R ETT <br /> Permit Services Permit Sel-vi~Pc <br /> Ref:Job Address: 423 Rockefeller Plan Check No: C2007-013 <br /> Owner: Haack Brothers Homes <br /> RE: Building Permit Review Letter Dear Mr. Haack, <br /> Dear Mr. Bronder, <br /> This letter is response to your letter dated Sept. 15, <br /> 1. On Sheet A2.0, plan notes indicate a dwelling-garage separation for walls. However, it does not <br /> appear to contain notes for fire-resistive protection for the habitable spaces above the garage. <br /> Please verify and revise notes and plans as required. IRC Table R302.5. <br /> - Per ESG Design response <br /> 2. On Sheet A4.1,a glulam 5.125 x 15 or 6.75 x 13.5 is proposed to transfer both gravity and <br /> overturning forces from the 2 nd floor shearwalls. The permit calculations appear to show a gravity <br /> design load check, but does not appear to verify that the proposed glulam can withstand a <br /> combination of overturning forces in addition to the gravity load. Please verify that this beam and <br /> its supporting construction are adequate to carry the load combination with lateral load <br /> overstrength factors. Also,details to transfer the overturning forces from the shearwall into the <br /> glulam beam appear to be missing. Please clarify the transfer detailing for these conditions. ASCE <br /> 7-10 12.3.3.3, 12.4.3, IRC R106.1.1. <br /> New calculations included for GIB(Sht.A4.1)for the load combination of gravity and <br /> overturning forces from shear walls above. Revised for GIB 6 3/4x16''A,dbl.joists under <br /> shear wall above and Simpson MST 36 at each end of shear wall around the floor joists. <br /> V_rik c •� <br /> If you have any questions, please call (425) 252-2373. /:�. comfort ��; � <br /> ry <br /> Sincer-ly, ��, , �; <br /> ,le 71\1 <br /> it 421.14;n3V <br /> tic q en'P.E. "LI <br /> 2' <br />
The URL can be used to link to this page
Your browser does not support the video tag.