Laserfiche WebLink
• <br /> t Mr. Jose Bazan <br /> Bazan Architects <br /> Plan Check Number: B2004-019, First Building Review <br /> May 21, 2020 <br /> Miscellaneous: <br /> 10. Detail 6/S-2 shows the typical header framing. The detail should be revised to provide <br /> connections between the header and supported framing. The connections should be adequate <br /> to comply with both IBC Section 1607.14 and ASCE 7-10 Section 12.1.4. See IBC Section <br /> 1613.1. <br /> This review has been performed for general compliance with the building codes as adopted and <br /> amended by the state of Washington and the city of Everett. Corrections and comments made <br /> during the review process do not relieve the project from compliance with code and permit <br /> requirements. The designers-of-record are responsible for a complete design in accordance with <br /> the laws of the state of Washington. <br /> If you have any questions or require additional clarification, please contact us. <br /> Respectfully, <br /> Drew Martin, P.E., S.E. <br /> Associate Engineer/ Commercial Plans Examiner <br /> (425)257-8813 <br /> dmartin@everettwa.gov <br /> S:\BMartin\2020\62004-019.docx <br /> 0 3200 Cedar Street © 425.257.8810 O everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/permits <br /> (Da...ge 5 of 5 <br />