My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1920 100TH ST SE 2023-06-28
>
Address Records
>
100TH ST SE
>
1920
>
1920 100TH ST SE 2023-06-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 8:22:18 AM
Creation date
5/31/2023 3:04:09 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SE
Street Number
1920
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jose Bazan . <br /> Bazan Architects <br /> Plan Check Number: B2004-019, First Building Review <br /> May 21, 2020 <br /> Gravity System: <br /> 5. The project includes a two-hour fire wall per the First Floor Plan on Sheet A2.03. The structure <br /> is required to be designed and detailed to allow collapse of the structure on each. The design <br /> does not appear to satisfy this requirement. Notable issues include, but are not limited to, the <br /> continuous north and south shear walls through the fire wall, and the north-south oriented truss <br /> spanning over the firewall. The structural design should be revised. See IBC Section 706.2. <br /> Lateral System: <br /> 6. The project includes a two-hour fire wall per the First Floor Plan on Sheet A2.03. The north and <br /> south shear walls are continuous through the fire wall; the walls should be discontinuous. The <br /> shear wall design should be revised. Additional holdowns should be provided at each end of <br /> each wall segment. Calculations substantiating the revised design should be submitted for <br /> review. See IBC Sections 706.2, 1604.1, 1604.4, 1613.1, and 2306.1, and AWC SDPWS-15 <br /> Section 4.3.6.4.2. <br /> 7. Sheet S-2 indicates that the prefabricated roof trusses will align with the east and west shear <br /> walls below. The trusses appear to provide the horizontal load path between the roof <br /> diaphragm and walls. Design criteria for the trusses should be included in Roof Plan 1/S-2. A <br /> detail should be provided in the drawings showing the required connections between the <br /> trusses, roof diaphragm, and shear wall. Alternatively, the shear wall sheathing should extend <br /> to the roof diaphragm. See IBC Sections 107.2.1, 1603.1.8, and 1604.4. <br /> 8. The shear wall holdown design is provided on pages 10 and 11 of the structural calculations. <br /> The earthquake component of the uplift forces exceeds 20% of the total uplift (i.e., the <br /> earthquake force is 100% of uplift force). The earthquake component shall be increased per <br /> the provisions of ACI 318-14 Section 17.2.3.4.3. In addition, the anchorage utilizies post- <br /> installed anchors and shall satisfy the provisions of Section 17.2.3.3. Revised calculations <br /> substantiating the holdown design shall be submitted for review. The design load shall be <br /> determined per ASCE 7-10 Section 12.4.3.2 Equation 7 including the vertical seismic load effect <br /> per Section 12.4.2.2. The seismic holdown forces shall be calculated even when wind controls <br /> the lateral design. See IBC Sections 1604.10, 1613.1, and 1901.2. <br /> 9. The project infills two separate buildings, effectively creating one structure. The infill should be <br /> designed to have connective capacity complying with ASCE 7-10 Section 12.1.3. Details for <br /> connections to the new and existing roof sections should be provided in the construction <br /> drawings. The roofs should be provided with subdiaphragms to develop the connection loads <br /> into the roof diaphragms. Calculations substantiated the connections and subdiaphragms <br /> should be submitted for review. See IBC Section 1604.1, 1604.4, and 1613.1. <br /> O3200 Cedar Street © 425.257.8810 0 everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/permits <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.