Laserfiche WebLink
<br />Page 21 <br />(Form Approved by City Attorney’s Office November 1, 2009) <br /> <br />22. Temporary power design <br /> <br />23. Load monitoring of existing electrical systems or circuit tracing of existing circuits and feeders <br /> <br />24. Emergency engine generator <br /> <br />25. Application or documentation for rebate program(s) other than listed in scope <br /> <br />26. Any coordination or permit application/acquisition for local department of transportation and/or any other <br /> agency not shown in the “inclusions” portion of the Scope of Work <br /> <br />27. Low voltage systems design and equipment specifications including the following: <br />a. Voice/Data, Network and Intercom systems <br />b. CCTV and Cable television systems <br />c. Building and site Fire alarm system <br />d. Security and Access Control systems <br />e. Audio/Video and Music/paging systems <br /> <br /> <br />Provided By Client – for Design West Engineering: <br /> <br />1. Record drawings of existing MEP systems, if available <br /> <br />2. Computer drawings files and associated support files as well as drawing format requirements <br /> <br />3. Catalog cuts of specific fixtures or equipment requested by your office or owner <br /> <br />4. Requirements of all equipment specified by your office and/or other consultants to be connected to <br /> mechanical, plumbing or electrical system <br /> <br />5. Format for book form specifications including font type, header and/or footer layout <br /> <br />6. Name, address and telephone number of any available project contacts (i.e. additional consultants, plan <br /> check, owner’s representative) <br /> <br />7. Restrictions or requirements to the property put in effect through conditional use permits or other likewise <br /> attachments to this property <br /> <br />8. Billing schedule for invoicing if specific requirements apply <br /> <br />9. 12 months of electric utility bills for verification of existing peak demand on main service <br /> <br />Cost of Services <br /> <br />TOTAL MAXIMUM COMPENSATION: <br />Architectural Services: <br />Permit & Construction Documents $60,240.00 <br />Bidding & Construction Services $30,330.00 <br />Construction Cost Estimate $18,620.00 <br />Construction Administration $22,200.00 <br />Sub-Consultants: <br />Structural Engineering $32,670.00 <br />------------------------------------------------------------------------------------- <br />Subtotal Architectural Services: $164,060.00 <br />