My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Carollo Engineers Inc. 5/4/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
Carollo Engineers Inc. 5/4/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2024 1:29:49 PM
Creation date
6/6/2023 2:40:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Carollo Engineers Inc.
Approval Date
5/4/2023
Council Approval Date
5/3/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
20th Street Sewer Rehabilitation Project
Public Works WO Number
UP 3799
Tracking Number
0003742
Total Compensation
$155,021.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Carollo Engineers Inc 9/17/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />pw:WA\Everett\_Proposals\Everett 20th Street Sewer Rehabilitation Scope 2023-0314.doc Page 6 of 7 <br /> <br /> <br />TASK 400 – FINAL DESIGN <br /> <br />The purpose of this task is to develop plans, specifications, and opinions of probable <br />construction cost for bidding and construction of the recommended improvements. <br />Subtask 410 – 90% Design Package <br /> <br />• Respond to and incorporate 50 percent deliverable City review comments. <br />• Prepare 90 percent design package including front end and technical <br />specifications, plans, and opinions of probable construction cost for City review. <br />• Conduct 90 percent design comment review meeting. <br />Subtask 420 – Internal QA/QC <br /> <br />• Perform internal QA/QC reviews at 90 percent level of design by senior level <br />engineers not directly involved with the design. <br />Subtask 430 – Final Bid Package <br /> <br />• Respond to and incorporate City review comments on the 90 percent deliverable. <br />• Prepare final, bid-ready specifications, plans, and engineer’s opinion of probable <br />construction cost. The final, bid ready documents will incorporate all Agency <br />permitting review comments as appropriate. <br />Assumptions <br />1. Final engineer’s opinion of probable construction cost will be formatted to directly <br />correlate with the final Bid Schedule. <br />2. Non-technical specifications will be City standard, “front end” legal and general <br />requirements in the City’s format. Upon City approval, the City’s specifications <br />may be supplemented with Carollo’s standard specifications and conditions if <br />deemed appropriate for the project. <br />3. Technical specifications will be Carollo standard, CSI formatted specifications (6- <br />digit, 50-division system). <br />4. Project specific traffic control plans will not be developed. Traffic control will be <br />the responsibility of the Contractor and in accordance with City and WSDOT <br />requirements. <br />5. Drawings will be produced in AutoCAD and AutoCAD Civil 3D software as <br />applicable. <br />Meetings <br />1. 90 percent design comment review meeting. <br />City Deliverables <br />1. Current City front end non-technical specifications. <br />2. 90 percent design package review comments using Bluebeam software. <br /> <br />Deliverables
The URL can be used to link to this page
Your browser does not support the video tag.