Laserfiche WebLink
1 <br />Exhibit A – Scope of Work <br />for <br />High-Rate Filtration Project Report <br />Jacobs Engineering Group Inc (Jacobs) shall provide the following services to City of Everett <br />(City). <br />Summary of Key Assumptions <br />There are several assumptions upon which the scope and budget for this work are based. These <br />are summarized below: <br />The Project Report documentation required by DOH for the on-going design work at the <br />Water Filtration Plant (WFP) for improvements identified in the 2021 WFP Facility Plan shall <br />be completed by others. On-going design work is understood to be for improvements <br />related to: the intake valve, flocculation basins, chemical storage, and CFDS valve/gate. <br />No additional hydraulic capacity analysis of the overall and various component elements of <br />the WFP is deemed necessary or planned as part of this work, as it was adequately covered in <br />the 2021 WFP Facility Plan. Additional hydraulic modeling will be completed during detailed <br />design. <br />The Project Report developed as part of this work shall reference and/or attach the 2021 <br />WFP Facility Plan and other applicable documentation, including the Project Report <br />documentation referenced above for the improvements that are currently being designed. <br />The Project Report being developed as part of this work shall briefly summarize but not <br />recreate or re-state any prior applicable documentation meeting the requirements of the <br />DOH Project Report. <br />Most of the requirements for a Project Report, as presented in WAC 246-290-110 are <br />applicable to this work and shall be addressed in the Project Report. These include all of <br />Articles (1), (2), and (3), and most of (4). However, some elements of WAC 246-290-110 <br />are not applicable to this work. These non-applicable elements include: (4)(a)(iii) and (v); <br />(4)(b)(ii), (iii), (iv), and (v); (4)(e), (g), (i), and (j). These non-applicable elements of WAC <br />246-290-110 will not be addressed in the Project Report for this work. <br />It is assumed that no updated to City’s Water System Plan (WSP) is required by DOH <br />associated with DOH’s review and approval of the Project Report for this work and the current <br />WSP can be referenced as required. <br />Task 1.Test Plan DOH Coordination <br />Jacobs shall provide additional support for coordination during the Pilot Study as requested by <br />the City, including three additional quarterly check-in meetings requested by DOH. Jacobs <br />support for these meetings shall include preparation of data in Microsoft PowerPoint format to <br />convey recent results and test status with DOH as well as coordination with the City prior to each <br />meeting to define the expected outcomes of each meeting, and the information to be presented.