My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group Inc. 1/5/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group Inc. 1/5/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2025 9:43:53 AM
Creation date
6/6/2023 4:09:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group Inc.
Approval Date
1/5/2023
Council Approval Date
1/4/2023
End Date
12/31/2025
Department
Public Works
Department Project Manager
Anna Thelen
Subject / Project Title
WFP Filter Pilot Technical Support
Tracking Number
0003757
Total Compensation
$276,572.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Jacobs Engineering Group Inc. 11/24/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />Task 2.System Operation <br />City staff have sole responsibility for operation, water quality analysis, and maintenance of the <br />pilot system. Jacobs has responsibility for data reporting and filter run summaries to allow City <br />staff to focus attention on running and optimizing the pilot system. <br />Pilot System Operation, Water Quality Analysis, and System Maintenance <br />City staff will maintain full responsibility for this subtask. This subtask will include the following <br />key activities: <br />Oversee and manage pilot system operation, checks, and monitoring <br />Backwash filters at end of filter runs <br />Perform appropriate maintenance <br />Collect samples and send to lab for routine and special sample events <br />Perform onsite benchtop analysis of key water quality parameters <br />Check operation of and calibrate online analyzers as needed <br />Jacobs staff will not be involved in this subtask. <br />Data Collection and Compilation, and Filter Run Reporting <br />City staff will maintain responsibility for the following components of this subtask: <br />Download data from online monitoring system and copy data from paper tracking forms into <br />electronic database and tracking tools <br />Continuously compile data collected during pilot test for analysis at completion of test <br />period <br />Process filter data at the completion of each filter run and develop graphs showing results <br />that can be used in filter run summary reports <br />Jacobs will be responsible for data analysis and reporting, and will lead bi-weekly status calls <br />with City staff: <br />Jacobs will prepare filter run summary reports for each filter run based on City pilot data <br />collection. Each report will show test conditions and filter performance, with comparisons to <br />control filter and full-scale plant performance. This includes noting operational or data <br />anomalies and likely explanations, as well as coordinating with City for review of information <br />included in reports. <br />Budget assumes summaries for 50 filter runs over 4 quarters of operation. <br />Jacobs to lead twelve (20) half to one hour bi-weekly calls with City staff as well as two (2) <br />site visits to review pilot plant operation and help troubleshoot operational challenges. <br />Jacobs to provide guidance for future filter runs based on operating conditions and the <br />findings of each filter runs summary report. <br />Deliverables: <br />Thirty (50) Filter Run Summary Reports <br />Twelve (20) sets of summary level (action items and major discussion topics) meeting notes <br />from bi-weekly pilot testing coordination calls sent via e-mail
The URL can be used to link to this page
Your browser does not support the video tag.