Laserfiche WebLink
Federal Avenue Modular Wetland Environmental Support Landau Associates <br />December 20, 2022 2 <br />assumes a moderate level of effort will be necessary for preparation of this report and assumes <br />preparation of a City-review draft, an Ecology-review draft, and final version of the report. <br />This task also includes a contingency budget for any additional visits to the project. Landau has <br />assumed 8 hours of support at the Senior Staff billing title and 2 hours at the Senior Associate billing <br />title. <br />Task 011 . Project Management <br />Project management includes project setup and closure, contracting, invoicing and budget tracking, <br />and coordination/communication with the City. <br />Estimated Cost <br />The estimated cost for the scope of services described above is detailed in Exhibit B. <br />Project Staff <br />Dylan Frazer, LG will manage the project. Dylan is project manager for the current contract between <br />the City and Landau and has managed work at both the ExxonMobil/ADC and the adjacent Kimberly- <br />Clark MTCA sites for both the City and the Port of Everett. Additional qualified Landau personnel will <br />be utilized to support the project team as needed during the project. <br />Landau understands that our services will be provided under the terms and conditions of a City- <br />originated Professional Services Agreement (PSA). This scope of work will be attached to the PSA as <br />Exhibit A, and our compensation schedule and cost estimate will be attached as Exhibit B. <br />Landau appreciates the opportunity to work with the City on this project. Please contact Dylan Frazer <br />(425) 329-0293 if you have any questions. <br />LANDAU ASSOCIATES, INC. <br /> <br /> <br /> <br />Dylan Frazer, LG <br />Senior Associate Geologist <br /> <br /> <br /> <br />Ken Reid, LG <br />Associate Engineering Geologist <br /> <br />DHF/KJR/ljl <br />X:\C_Everett\2022-12_Modular Wetland Reporting\Exhibit A and B-Landau C_Everett Modular Wetland Env. Support_Scope and Budget Letter_122022.docx <br />2023-0702 <br />Attachments: Exhibit B—Estimated Costs and Compensation Schedule