My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FileTrail 3/6/2023
>
Contracts
>
Agreement
>
Software/SaaS Agreements
>
FileTrail 3/6/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2023 2:17:22 PM
Creation date
6/7/2023 2:16:56 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
FileTrail
Approval Date
3/6/2023
Department
Information Technology
Department Project Manager
Judie Shirley
Subject / Project Title
FileTrail v5 Upgrade SOW
Tracking Number
0003774
Total Compensation
$3,800.00
Contract Type
Agreement
Contract Subtype
Software/SaaS Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett <br />v5 Upgrade <br /> <br /> <br /> Page 1 <br /> <br /> <br />METHODOLOGY <br />FileTrail’s project methodology reflects our core goals: <br />▪ 100% reference ability among our client base. <br />▪ Application of “Best Practices” in our client’s operations. <br />▪ A smooth transition and thorough training for staff. <br />▪ Minimal system downtime in the final migration to FileTrail. <br /> <br />FileTrail has created a unique methodology for projects that generates optimal results while minimizing <br />project costs and time-to-completion. <br />Our methodology utilizes documented steps, supported by clear instructions and <br />worksheets to minimize the time required to complete processes. <br />This document provides a high-level look at the methodology for implementing FileTrail’s Physical <br />Records Management system. Details of the more complicated steps are communicated through <br />individual guides that are focused on that step. <br />Implementation of Document Connectors for Policy Management or Matter Mobility will be performed <br />in a later phase. <br /> <br />OBJECTIVE <br />Upgrade City of Everett’s FileTrail installation from v3.x to v5.4 and upgrade their database from <br />v3.x to v5.6 <br /> <br />SCOPE <br /> <br />1. Kick Off <br />Highlights Goals <br />▪ Internal Project Preparation by FileTrail. <br />▪ Virtual meetings via the Web to validate Findings from the City of <br />Everett Team. <br /> <br /> <br />▪ Kick off meeting establish “Project <br />Plan” with the City of Everett team <br />sponsor(s). <br />▪ Ensure that all participants have a <br />clear understanding of the project <br />and roles. <br />DocuSign Envelope ID: 0A94208D-D9FC-4A07-9B85-DAEDD172BD31
The URL can be used to link to this page
Your browser does not support the video tag.