My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mackenzie 2/27/2023 Amendment 3
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Mackenzie 2/27/2023 Amendment 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:21:37 PM
Creation date
6/9/2023 2:21:12 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Mackenzie
Approval Date
2/27/2023
Council Approval Date
2/22/2023
End Date
12/31/2026
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
EMB PW Tenant Improvement Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
3
Tracking Number
0002598
Total Compensation
$2,256,205.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Exhibit A <br />Amendment No.3 – Additional Scope of Work <br /> <br />Phase II: Design Development, Construction Documents, Permitting, Bidding & <br />CCA <br /> <br />Mackenzie’s integrated team of design professionals will provide Architectural, Interior <br />Design, and Structural Engineering services for the Everett Municipal Building – Public <br />Works Improvement Project. In addition, Mackenzie will retain BCE Engineers <br />(Mechanical, Electrical, and Plumbing Engineers), Roen & Associates (Cost Estimating), <br />and the Greenbusch Group, Inc. (Acoustical Design) as consultants to complete the team. <br />Our team has been chosen specifically for their technical knowledge and design expertise <br />related to this project type, and a demonstrated ability to successfully deliver projects <br />with a high level of Client service. <br /> <br />The following items will be added to the work: <br /> <br />BASIS OF DESIGN <br /> <br />The following describes in detail the elements that define the basis of services. <br /> <br />Team Structure | Engagement <br /> <br />1. It is understood that the primary point of contacts with Client will be the Parks & <br />Facilities Planning & Capital Projects Manager Ruben Sanchez as the project lead, and <br />the Parks & Facilities Assistant Director Jeff Harris will be copied on all correspondence. <br /> <br />2. Client’s Core Team will comprise Ruben Sanchez, Jeff Harris, and Ryan Sass. <br /> <br />3. In addition to Client’s Core Team, engagement will occur with each of Client’s <br />program divisions, City Council, and Mayor Cassie Franklin at key meeting milestones <br />throughout the process. <br /> <br />4. During the course of the project, Mackenzie (Kim Doyle) will schedule weekly 30- <br />minute conference call check-ins with City Project Manager and Representative(s). <br /> <br />Phase II: Design Development through Construction Contract Administration <br /> <br />1. Design Development <br /> <br />2. Construction Documents <br /> <br />3. Permitting <br /> <br />4. Bid Assistance <br /> <br />5. Construction Contract Administration <br />
The URL can be used to link to this page
Your browser does not support the video tag.