Allied Construction Associates Inc. 4/12/2023 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Allied Construction Associates Inc. 4/12/2023 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:13 PM
Creation date
6/9/2023 3:08:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/12/2023
Department
Public Works
Department Project Manager
Allied Construction Associates Inc.
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0002874
Total Compensation
$98,230.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Allied Construction Associates Inc. 4/23/2021
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br />Change Order No. 1 <br />Change Order Effective Date: March 13, 2023 <br /> <br /> <br /> <br />EXHIBIT A—DESCRIPTION OF CHANGED WORK <br /> <br />This Change Order No. 1 modifies one (1) existing bid item and adds five (5) new items <br />to the Contract, as described below. <br /> <br /> <br />MODIFIED BID ITEMS <br /> <br /> <br />Bid Item # 8 – Foundation Material, Class A or B. Modify bid item entitled, <br />“Foundation Material, Class A or B” at the bid item unit price of $150.00/Ton, by adding <br />25 Tons to the Contract, resulting in a Contract increase of $3,750.00. <br /> <br /> <br />ADDED ITEMS <br /> <br /> <br />New Item # 100 – Open Cut and Remove portion of 60-Inch Reinforced Concrete <br />Pipe (RCP). Add new item entitled, “Open Cut and Remove portion of 60-Inch <br />Reinforced Concrete Pipe (RCP)” at the agreed to Lump Sum Price of $80,000.00, <br />resulting in a Contract increase of $80,000.00. This work included the following: Install <br />sumps & pumps, remove 60-Inch RCP to springline, keep fuel in generator, Vactor work <br />around underground electrical power, set up additional pump system, clean & service <br />pumps, monitor pumps during low & high tide, install additional shoring, over excavate <br />sides of 60-Inch RCP, implement steel sheets for additional shoring, remove shoring <br />boxes & rebuild them from 10 foot spreaders to 12 foot spreaders, build grout dam, and <br />remove 60-Inch grout plug & replace with new plug. <br /> <br />New Item # 101 – Additional Backfill of 60-Inch RCP. Add new item entitled, <br />“Additional Backfill of 60-Inch RCP” at the agreed to Lump Sum Price of $10,000.00, <br />resulting in a Contract increase of $10,000.00. <br /> <br />New Item # 102 – Remove and Dispose of Concrete Rubble and Remove Steel <br />Sheets. “Add new item entitled, “Remove and Dispose of Concrete Rubble and <br />Remove Steel Sheets” at the agreed to Lump Sum Price of $12,500.00, resulting in a <br />Contract increase of $12,500.00. This work included the following: Load and export <br />concrete rubble from site, place 4”x8” spalls, return steel sheets to vendor, breakdown <br />generator pump, remove plastic, remove sandbags, and place ecology block over 60- <br />Inch RCP. <br /> <br /> <br />