<br /> <br /> <br /> <br /> <br /> <br />Change Order No. 1 <br />Change Order Effective Date: March 13, 2023 <br /> <br /> <br />New Item # 103 – Additional Grading and Erosion Control Work. Add new item <br />entitled, “Additional Grading and Erosion Control Work” at the agreed to Lump Sum <br />Price of $7,500.00, resulting in a Contract increase of $7,500.00. This work included <br />the following: Complete grading material from stockpiles created by over excavation <br />work, plant grass seed, spread straw over graded and seeded area, install drainage <br />ditch to divert runoff water from SR08, and dispose of miscellaneous debris from site. <br /> <br />New Item # 104 – Credits to the City of Everett. Add new item entitled, “Credits to <br />the City of Everett” at the agreed to Cost Credits of $15,520.00, resulting in a Contract <br />decrease of $15,520.00. <br /> <br /> <br />COST CREDITS <br /> <br /> <br />1. Kwik-Zip HDX90 48-Inch Spacers not used in SR08 Slipline Pipe, but part of <br />overall cost of slipline pipe installation bid. Cost Credit=$3,950.00 <br />2. Project specifications required a hydrostatic pressure test for the HDPE Slipline, <br />but the contractor requested visual inspection, which was granted for a suitable <br />cost credit to the COE. Cost Credit=$1,285.00. <br />3. Bid Item # 7-Dewatering, required a dewatering plan prepared and submitted by <br />a Professional Hydrogeologist, which was never submitted to the COE, partly <br />due to the fact that dewatering changed when work scope changed, and much of <br />that work was completed on force account. Cost Credit=$9,000.00. <br />4. Bid Item # 12-Ductile Iron Pipe, Fittings, Valves for SEI to SRI Intertie. <br />Specifications required hydrostatic pressure testing. The contractor requested <br />visual inspection of the 30-Inch Ductile Iron Pipe in lieu of hydrostatic pressure <br />testing, which was granted for a suitable cost credit to the City of Everett. Cost <br />Credit=$1,285.00. <br /> <br /> <br />ITEM # 104 TOTAL COST CREDITS <br /> <br /> <br />$3,950.00+$1,285.00+$9,000.00+$1,285.00=$15,520.00 <br /> <br /> <br />JUSTIFICATION <br /> <br /> <br />Bid Item # 8 – Foundation Material, Class A or B. This bid item exceeded plan <br />quantities and is being modified to account for additional quantities of this bid item. <br /> <br />