<br /> <br /> <br /> <br /> <br /> <br />Change Order No. 1 <br />Change Order Effective Date: March 13, 2023 <br /> <br /> <br />New Item # 100 <br />New Item # 101 <br />New Item # 102 <br />New Item # 103 <br /> <br />All four items were added due to the changed condition of the existing 60-Inch <br />reinforced concrete pipe which was not as depicted on the approved plan drawings. <br />The poor condition of the pipe caused it to sag, and the outfall portion of the pipe was <br />under water in the Snohomish River. This project did not have the necessary permits to <br />do in water work, so the method of work by the contractor changed, which led to added <br />costs. These new items are being added to account for those added costs. <br /> <br />New Item # 104: This new item includes requirements of the Contract that were not <br />used or utilized, due to the changed scope of the work to slipline the existing 60-Inch <br />Reinforced Concrete Pipe with a 48-Inch HDPE Pipe. This new item accounts for those <br />costs, which are cost credits to the City of Everett. <br /> <br /> <br />TOTAL COSTS FOR CHANGE ORDER # 1 <br /> <br /> <br />Item 008 $ 3,750.00 <br />Item 100 $ 80,000.00 <br />Item 101 $ 10,000.00 <br />Item 102 $ 12,500.00 <br />Item 103 $ 7,500.00 <br />Item 104 $ 15,520.00 <br />Total $ 98,230.00 <br /> <br /> <br />CONTRACT TIME <br /> <br />There are 17 working days added to the Contract.