My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DKS Associates 3/27/2023 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2023
>
DKS Associates 3/27/2023 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:19:36 PM
Creation date
6/9/2023 3:19:19 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
DKS Associates
Approval Date
3/27/2023
Council Approval Date
3/22/2023
End Date
12/31/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Traffic signal modifications at Evergreen Way and 79th Pl SE
Public Works WO Number
PW3737, PW3790
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003347
Total Compensation
$162,372.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assumptions: <br />1.OWNER will provide a project manager to respond to the <br />CONSULTANT questions and approval of any potential contract <br />changes, material over-runs, and differing site conditions. <br />2.OWNER will assume management of stakeholders and public <br />relations. <br />3.The appropriate Engineers of Record will review submittals, RFI’s and <br />potential changes. No design plan revisions. All design changes will <br />be updated into the as-built plans. <br />Deliverables: <br />1.Submittal approval for up to 10 submittals and requests for information <br />(RFIs) responses limited to 5 RFIs; Facilitate responses to RFI’s and <br />submittals, ensuring response timelines by the construction contractor, <br />are met for both. Maintain RFI and submittal log to track status and <br />responses <br />2.Lump sum breakdown review. Also, evaluate design changes, design <br />clarifications and other requested deviations from approved design <br />and/or coordinate evaluations and interpretations with the appropriate <br />authorities. <br />3.Change order review and support back up documentation limited to two <br />(2)Change orders. <br />4.Prepare and take part in the Substantial Completion inspection and <br />punch-list reconciliation. <br />5.As-built plans. <br />10.POTHOLING (NOT USED)
The URL can be used to link to this page
Your browser does not support the video tag.