My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DKS Associates 3/27/2023 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2023
>
DKS Associates 3/27/2023 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:19:36 PM
Creation date
6/9/2023 3:19:19 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
DKS Associates
Approval Date
3/27/2023
Council Approval Date
3/22/2023
End Date
12/31/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Traffic signal modifications at Evergreen Way and 79th Pl SE
Public Works WO Number
PW3737, PW3790
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003347
Total Compensation
$162,372.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The CONSULTANT will update quantity takeoffs and prepare a final <br />estimate of probable construction costs. <br /> <br />The CONSULTANT will attend the 90% design review meeting to clarify and <br />address review comments. The meeting will be up to one hours long, and <br />the CONSULTANT will document responses to ensure that any outstanding <br />issues are addressed. <br /> <br /> <br /> <br />Deliverables: <br /> <br />• Final Ad-Ready Plans, Traffic signal and ITS Specifications <br />only for insertion into City’s master package & Estimate in <br />electronic format (native and PDF) <br />• 90% comment and resolution documentation. <br /> <br /> <br /> <br /> <br />OPTIONAL TASKS: To be added when requested by the City of Everett PM. <br /> <br /> <br />8. BID SUPPORT (NOT USED) <br /> <br /> <br /> <br />9. CONSTRUCTION SUPPORT (supplemented) <br /> <br />A. Attend pre-construction meeting to answer technical questions from <br />contractor. <br /> <br />B. Provide “as built” plans 30 days after project completion. <br /> <br />C. Consultant shall be available to answer questions during advertisement and <br />provide technical advice during the construction phase. <br /> <br />D. Respond to contractor’s Requests for Information (RFI) as necessary (5). <br /> <br />E. Prepare reproducible final construction plans, utilizing AutoCAD at 20 scale <br />(or whatever scale is most feasible), on the City of Everett title blocks. All <br />construction shall be per City of Everett standards, unless indicated <br />differently on the plan. Provide “as built” plans 30 days after project <br />completion <br /> <br />F. Participate in one walk-through final check of the project to assure the work <br />is in substantial conformance with the approved construction documents. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.