My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/06/14 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/06/14 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 11:18:47 AM
Creation date
6/14/2023 5:59:39 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Water Treatment Plant Portal 4 Improvements 1 Amendment 2 Scope of Work <br />Task Assumptions <br />• The design will be completed in two submittals. A draft set of drawings will be provided to the <br />City for review and comment. Following the City's review, BC will address comments and finalize <br />the design documents. <br />• Draft design documents will be delivered to the City four weeks following amendment approval. <br />Final design will be submitted two weeks after receiving City review comments. <br />• Design drawings will be prepared in 2D AutoCAD and adhere to the City's CAD standards. <br />Drawings will be signed and sealed by a Professional Engineer licensed in the State of <br />Washington. <br />• The proposed budget assumes the review of three submittals - precast concrete vault shop <br />drawings, ladders, and hatches. <br />• The proposed budget assumes the review of two RFIs. <br />• No geotechnical work will be completed as part of this scope of work. <br />• City or Contractor to provide certified survey elevations of the crown of the intertie pipeline and <br />grade elevation. <br />• This work does not include development of a cost estimate. <br />• This work will be completed under existing project phase 702 Services During Construction and <br />a new project Phase 703 Vault Design as outlined in Exhibit B. <br />Work Products <br />• Draft design drawings and specifications. <br />• Stamped and sealed final design drawings and specifications. <br />• CAD files of design drawings. <br />Attachments <br />Exhibit A Amendment Budget Summary <br />Exhibit B Project Budget Summary <br />Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.