Laserfiche WebLink
EXPLANATION IScope of Work: At Phase 1 the 15-inch discharge line from the j <br /> Extent of excavationI southerly limit to Federal Avenue requires a bypass (bypass 1). The I APPROXIMATE SCALE <br /> PORT OF EVERETT x protective measures during exposure include soft and/or hand digging <br /> UTILITIES LEGEND I techniques. The line will be cut at three locations, just beyond both it <br /> -- TELEPHONE southerly and northerly limits of the excavation area and at Federal Avenue. i 0 40 Feet <br /> ELECTRICAL I The cut sections will be demoed and replaced following completion of <br /> ---- WATER x <br /> ----- STORM DRAIN I excavation activities. The upstream ends will have a plastic lined sump pit to <br /> EVERETT <br /> SEWER catch water and pump to discharge location. Water will be connected to the SHIP REPAIR <br /> O POWER, COMMUNICATION,AND OR I inlet side of two 4-inch automated trash pump and discharge hose will be WAREHOUSE <br /> SECURITY CAMERA POLE i <br /> NOTES: placed into the pipe and/or a catch basin inlet located downstream in the <br /> Federal Avenue right of way. In order to maintain service (Temporary Ix <br /> 1. POLE TO BE DECOMISSIONED BYSNOHOMISH COUNTY PUD AND WAVE BROADBAND i <br /> PRIOR TO PHASE 4 MOBILIZATION.POLE TO BE REMOVED BY THE CONTRACTOR PRIOR I Condition), the discharge side of the pumps will be connected to separate i <br /> TO EXCAVATION AND REINSTATED UPON COMPLETION OF PROJECT. x lines going downstream to the storm drain. The pumps, which are equipped <br /> 2. CONTRACTOR TO INSTALL STORM DRAIN BYPASS FOR PROJECT EXECUTION AND I with flow SW1tCheS and a telemetrystem, will be laced lri auto mode <br /> REPLACE STORM DRAIN UPON COMPLETION OF PROJECT. system, h <br /> 3. SEWER LINE TO BE REMOVED AND NOT REPLACED I enabling uninterrupted service. Note: The Same steps will be followed <br /> x through the the completion of Phases 2, 3, & 4 for the 15-inch line going w <br /> north, with the 15-inch lines to the south and east (Federal Avenue) and the =1 I <br /> inlet being restored to (Final Condition) upon the completion of the Phase 2 <br /> x <br /> Iexcavation. A single bypass will be maintained for the 15-inch line to the <br /> Utility Site Plan I north, with actual locations of the bypass changing based on the completion CANOPY <br /> of the excavation activities, until the completion of the Phase 4 excavation, j x <br /> when that line will then be restored to (Final Condition). IIt <br /> ', I <br /> x DUNLAP TOWING <br /> Phase 4 1., 1 ,! S <br /> Phase 1 � �.,. A <br /> Bypass#1 / Phase 2 Phase 3 <br /> / ♦ x <br /> `\��� ' I ♦♦ h �VEIhETTIP �i I <br /> ����`` x / ♦♦ I II EPAI <br /> PRjABLE <br /> - <br /> Note 1 E ` / ,�`- ♦♦ I OFTICE x NOTE 1 <br /> i I `� I NOTE3 ♦♦ ; I I <br /> --- -- ► E_,- Bypass#2 ,I ♦ i I <br /> E _ 'I♦ <br /> Inlet location for discharge, OTE 2 J <br /> -�- � ------ - ----L- N !W'.11 -'� —x— —x w <br /> Ali -- �� ♦ --i-----\ <br /> ♦ i Note 1 Note 1 .� E <br /> _ _'L % �i /r--------------=yq�r--y---- 1 - I ---`-` ----- - Nbte1 -- I „•�•,•+':•• <br /> �T-----------------I <br /> -- __ _ _ FEDERAL AVENUE <br /> —S <br /> +— - s' <br /> x— i-vw <br /> x I <br /> I <br /> I T' � I S <br /> KIMBERLY-CLARK <br /> x WAREHOUSE <br /> --_ �----------------- ---------� <br /> PROJECT NO. 3 DRAWING: <br /> 031447 2 Q D P- 2 PROJECT AREA PLAN WITH UTILITIES Sheet <br /> FN: <br /> 031447-GSP NO, DATE REVISIONS <br /> LAST REV.DATE: DRAWN: SCALE: PORT OF EVERETT <br /> 03/21/22 HALEY ROBBERTZE "-40' 2730 Federal Avenue <br /> 1 <br /> DATE: 03/21/22 APPROVED: JIM TWIFORD Everett, Washington Cardno® <br />