Laserfiche WebLink
EXPLANATION IScope of Work: At Phase 1 the 15-inch discharge line from the j <br /> Extent of excavationI southerly limit to Federal Avenue requires a bypass (bypass 1). The I APPROXIMATE SCALE <br /> PORT OF EVERETT x protective measures during exposure include soft and/or hand digging <br /> UTILITIES LEGEND I techniques. The line will be cut at three locations, just beyond both �I <br /> X <br /> 0 40 80 <br /> -- TELEPHONE southerly and northerly limits of the excavation area and at Federal Avenue. , Feet <br /> ELECTRICAL I The cut sections will be demoed and replaced following completion of <br /> ---- WATER x <br /> -———- STORM DRAIN I excavation activities. The upstream ends will have a plastic lined sump pit to <br /> I EVERETT <br /> I <br /> SEWER catch water and pump to discharge location. Water will be connected to the SHIP REPAIR <br /> O POWER, COMMUNICATION,AND OR inlet side of two 4-inch automated trash pump and discharge hose will be WAREHOUSE <br /> SECURITY CAMERA POLE i <br /> NOTES: placed into the pipe and/or a catch basin inlet located initially at location <br /> #1. In order to maintain service (Temporary Condition), the discharge 'x <br /> 1. POLE TO BE DECOMISSIONED BYSNOHOMISH COUNTY PUD AND WAVE BROADBAND i <br /> PRIOR TO PHASE 4 MOBILIZATION.POLE TO BE REMOVED BY THE CONTRACTOR PRIOR I side of the pumps will be connected to separate lines going downstream to i <br /> TO EXCAVATION AND REINSTATED UPON COMPLETION OF PROJECT. " the PS05 overflow. The pumps, which are equipped with flow switches and <br /> 2. CONTRACTOR TO INSTALL STORM DRAIN BYPASS FOR PROJECT EXECUTION AND I a telemetr s stem, will be laced lri auto mode enabling uninterrupted <br /> REPLACE STORM DRAIN UPON COMPLETION OF PROJECT. y y h g <br /> 3. SEWER LINE TO BE REMOVED AND NOT REPLACED I service. Note: The same steps will be followed through the the <br /> x completion of Phases 2, 3, & 4 for the 15-inch line going north, with the sw <br /> 15-inch lines to the south and east (Federal Avenue) and the inlet being <br /> restored to (Final Condition) upon the completion of the Phase 2 excavation. 1 <br /> I A single bypass will be maintained for the 15-inch line to the north, with <br /> Utility Site Plan I actual locations of the bypass changing based on the completion of the CANOPY PS05 Sewer Overflow Manole <br /> excavation activities, until the completion of the Phase 4 excavation, when j x <br /> APPROVED I that line will then be restored to (Final Condition). NR ►, I <br /> PUBLIC WORKS DEPARTMENT i N�' '1 DUNLAP TOWING <br /> BY: Thad Newport -- ` ® Phase 4 I. <br /> DATE: 08/30/2022 I Phase 1 <br /> CITY OF EVERETT REVIEWED FOR PERMIT <br /> Bypass#1 / Phase 2 / se 3 q <br /> Inlet location for discharge#1! — —♦_ � I; V F EPT <br /> ���� \hhhh1���� ♦♦ I Iq PDRIABLE <br /> Note 1 �� / --L{—Y ♦♦ I OFTICE NOTE 1 <br /> x <br /> v <br /> E_,._.._ E / I �\ <br /> Bypass#2 _—__ I NOTE 3 ♦ i I <br /> 13 El <br /> -ice ----\ ----- _ __-- ❑ �� _ —x— —x I w <br /> I <br /> -- <br /> `- 101, \ ♦♦ r — —� Note 1 Note 1 <br /> r--------------=yq�r--y----------�-- - I ---`—` ----- — Nbte1 -- I „•�•,•+':•• <br /> �T-----------------I <br /> __ I ---;- _____ _ FEDERAL AVENUE <br /> ___---- - <br /> w <br /> I � C) I x II <br /> I <br /> I T' I S <br /> E KIMBERLY-CLARK <br /> WAREHOUS <br /> X <br /> E <br /> --_ �----------------- ---------� <br /> PROJECT NO. 3 DRAWING: <br /> 031447 2 Q D P- 2 PROJECT AREA PLAN WITH UTILITIES Sheet <br /> FN: <br /> 031447-GSP NO, DATE REVISIONS <br /> LAST REV.DATE: DRAWN: SCALE: PORT OF EVERETT <br /> 03/21/22 HALEY ROBBERTZE 1.1 40' 2730 Federal Avenue <br /> DATE: 03/21/22 APPROVED: JIM TWIFORD Everett, Washington Cardno® <br />