My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-51 2023-06-15
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-51
>
3003 W CASINO RD BLDG 40-51 2023-06-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2023 9:04:59 AM
Creation date
6/15/2023 8:34:36 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-51
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REMOVAL <br />6" LPS <br />PROFESSIONAL STAMP & SIGNATURE <br />APPLIES TO WORK WITHIN THE CLOUDED <br />REVISION AREAS ONLY AS INDICATED <br />F!ENNEERS <br />Seattle // Spokane // Baltimore <br />SYM <br />REVISION <br />BY <br />APPROVED <br />DATE <br />SYM <br />REVISION <br />BY <br />APPROVED <br />DATE <br />M. Cyq <br />����oF �nsy, <br />ACCEPTABILITY <br />THIS DESIGN AND/OR <br />E.76BINETTE <br />— <br />RECORD DWG. — LOCKWOOD GREENE <br />3/94 <br />y1r <br />71- <br />SPECIFICATION IS APPROVED <br />VHECKED <br />MILLS <br />A <br />767 VERTICAL PAINT BOOTH VENTILATION W5523782 <br />FSi <br />KMC <br />06.18.2021 <br />D GARNJOST <br />APPROVED BY <br />DEPT. <br />DATE <br />B <br />767 VERTICAL PAINT BOOTH VENTILATION - PHASE 2W5523782 <br />FSi <br />KMC <br />06.27.2022 <br />CHECKED <br />==6 �e <br />,._ SST <br />V. MILLS <br />APPROVED <br />06Y1.20n <br />.qr. I <br />GENERAL NOTES: <br />A. FOR GENERAL NOTES AND LEGEND SEE <br />SHEET M2. <br />B. FOR LIST OF RELATED DRAWINGS <br />SEE SHEET M1. <br />REMOVAL NOTES <br />REMOVE STEAM PIPING, INSULATION <br />FITTINGS, AND SUPPORTS. SEE DETAILS <br />2/M507R AND 3/M507R. <br />REMOVE HEATING COIL FROM HRU-1 AND <br />HRU-2. <br />REMOVE STEAM TRAP, BYPASS VALVE <br />PIPING, AND COIL CONNECTION PIPING. <br />SEE DETAILS 2/M507R AND 3/M507R. <br />® REMOVE HUMIDIFIER HU-1 FROM HRU-1 <br />AND HU-2 FROM HRU-2. SEE DETAIL <br />REMOVE LEAKING STEAM VALVE FROM <br />HRU-1 AND HRU-2. CONTRACTOR <br />IDENTIFIED LEAKING VALVES ON EXISTING <br />SYSTEM. REMOVE AND REPLACE LEAKING <br />VALVES IN KIND. <br />© REMOVE LEAKING STEAM VALVE FROM <br />HRU-2. CONTRACTOR IDENTIFIED LEAKING <br />VALVES ON EXISTING SYSTEM. REMOVE <br />AND REPLACE LEAKING VALVES IN KIND. <br />TO HRU-3 & 4. <br />'CONT. ON SHEET M <br />ISSUED FOR CONSTRUCTION <br />DESIGN BY FSi DATE 06.27.2022 <br />J5TE <br />-13-92 SUBTITLE FLOW DESIGN <br />6-10-92 STEAM & CONDENSATE <br />05-13-92 TITLE 767 VERTICAL PAINT BOOTH VENTILATION - PHASE 2 <br />8 10 92 BUILDING 40-51 <br />9-11-92 <br />9-11-92 MECHANICAL MASTER <br />KLVINUIV JTMtlUL UHIt <br />W5523782 B 06.27.2022 <br />M4R <br />94049.01 1 00018760 <br />DWG NO. <br />40-51 40-51-M4R <br />
The URL can be used to link to this page
Your browser does not support the video tag.