Laserfiche WebLink
LEGEND <br />u� <br />W <br />u� <br />C375 C425 C45 C4.75 (5 <br />B <br />1 M501 <br />O.A. LOUVER <br />168"X192" <br />(64,000 CPM) <br />O.A. LOUVER <br />168"X192" <br />(64,000 CPM) <br />O.A. LOUVER <br />168"X192" <br />(64,000 CPM) <br />O.A. LOUVER <br />168"X192" <br />(64,000 CPM) <br />I <br />I <br />I <br />I <br />1-7 <br />DISCHARGE SHUTT I <br />68" 0 UP TO <br />— — ROOF LEVEL <br />SF-1 I I D <br />ROOF UP TO 3 3 <br />1 2 HRU-1 1 2 <br />PLATFORM <br />4"X48" ST-1 ST <br />PLATFORM 84"X42" T <br />o T �� <br />wr <br />84"X42" <br />BOD EL. 160-8" <br />84"x42" <br />BOD EL. 164"-10" <br />42 X84 „ 42 X,84 „ <br />TOD EL. 145 —0 TOD EL. 145 —0 <br />VPB #1 EXH. PLENUM <br />I <br />68 <br />flew <br />0 UP LEVEL <br />—3 <br />68" <br />ROOF <br />HRU-4 <br />P T <br />LEVE <br />Elba <br />rsad <br />Bw <br />AAD IN <br />VERT. RISER <br />PLATFORM <br />84"X42"00 <br />84"X42" <br />I <br />I <br />I <br />I <br />I <br />I <br />84"X42" <br />EL. 171'-10" <br />„ <br />50 X84 <br />TOD EL. 144'-8" <br />84"X42" <br />TOD EL. 171'— <br />VPB #2 EXH. <br />PLENUM <br />0" <br />SYM <br />REVISION <br />BY <br />APPROVED <br />DATE <br />A <br />AS-BUILTS J#964058-01 <br />CANADA <br />07.22.96 <br />B <br />767 VERTICAL PAINT BOOTH VENTILATION W5523782 <br />FSi <br />KMC <br />06.18.2021 <br />C1 <br />767 VERTICAL PAINT BOOTH - ADDENDUM 1 W5523782 <br />FSi <br />KMC <br />07.07.2021 <br />D <br />767 VERTICAL PAINT BOOTH VENTILATION - PHASE 2 W5523782 <br />FSi <br />KMC <br />06.27.2022 <br />SYM <br />Wkip M <br />MATCH LINE - FOR CONTINUATION SEE SHT. 4M 13 <br />FOURTH FLOOR PLAN <br />SCALE: 1 /8"=1 '—O" <br />REMOVAL <br />BY I APPROVED I DATE <br />PROFESSIONAL STAMP & SIGNATURE <br />APPLIES TO WORK WITHIN THE CLOUDED <br />REVISION AREAS ONLY AS INDICATED <br />9L_""A,FArw" <br />FENEERS <br />Seattle // Spokane // Baltimore <br />ACCEPTABILITY <br />THIS DESIGN AND/OR <br />SPECIFICATION IS APPROVED <br />APPROVED BY I DEPT. I DATE <br />DRAWN DATE SUBTITLE <br />B.R. 07.22.96 <br />"NECKED <br />M.C.S. 07.22.96 <br />NGINEER TITLE <br />Q.C. 07.22.96 <br />CHECKED <br />07.22.96 <br />FOR LEGEND AND ABBREVIATIONS, SEE SHEETS <br />M1D, M2A, & M213. <br />GENERAL NOTES <br />1. <br />CONTRACTOR SHALL INVESTIGATE AND VERIFY <br />LOCATIONS OF STRUCTURAL, MECHANICAL, AND <br />ELECTRICAL ELEMENTS AND OTHER EXISTING <br />CONDITIONS PRIOR TO JOB START. <br />UH-13 BOTTOM <br />2• <br />ANY DISCREPANCIES BETWEEN EXISTING <br />OF UNIT EL. 174'-7" <br />CONDITIONS AND CONTRACT DOCUMENTS SHALL BE <br />CALLED TO THE ATTENTION OF THE OWNER. <br />A <br />3. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />SAFETY IN THE AREA OF WORK IN ACCORDANCE <br />EXH. LOUVER <br />60"X60" <br />WITH ALL APPLICABLE CODES AND STANDARDS. <br />4. <br />THE CONTRACTOR SHALL COORDINATE SYSTEM <br />�`-- <br />SHUT DOWNS WITH THE BOEING CONSTRUCTION <br />MANAGER. <br />5. <br />INSTALLATION AND DESIGN OF VENTILATION <br />AAD <br />SYSTEM SHALL BE IN ACCORDANCE WITH <br />SPECIFICATION DIVISION 23. <br />6. <br />NO PRODUCTS CONTAINING SILICONE SHALL BE <br />USED IN THIS BUILDING. <br />REMOVAL NOTES <br />— PLATFORM <br />REMOVE EXISTING HEAT RECOVERY WHEEL AND <br />WHEEL DEBRIS WITHIN HRU-1 AND HRU-2. <br />— ST-4 IN VERTICAL <br />BLANK —OFF AND SEAL UNIT TO SEPARATE SUPPLY <br />AND EXHAUST AIRSTREAMS. PLENUM, CASING, AND <br />ACCESS DOORS TO REMAIN. BLANK —OFF SHALL BE <br />CONSTRUCTED PER SMACNA PRESSURE TESTING <br />D <br />STANDARDS FOR A DIFFERENTIAL PRESSURE OF 8 <br />INCHES W.C., AND BE RATED AS A WALKABLE <br />SURFACE. CONTRACTOR SHALL PROVIDE <br />_�L�; ' <br />STRUCTURAL ENGINEERING CALCULATIONS BY A <br />STRUCTURAL ENGINEER LICENSED IN THE STATE OF <br />WASHINGTON TO VERIFY THE WALKABLE SURFACE <br />A <br />RATING. <br />M11 M500 <br />REMOVE EXISTING STEAM HEATING COIL. <br />— 50"X84" <br />REMOVE EXISTING STEAM HUMIDIFIER. <br />TOD EL. 144'-8" <br />ISSUED FOR CONSTRUCTION <br />DESIGN BY FSi <br />DATE 06.27.2022 <br />DUCTWORK FOURTH FLOOR PLAN <br />767 VERTICAL PAINT BOOTH VENTILATION — PHASE 2 <br />BUILDING 40-UU I <br />MECHANICAL MASTER COL. A—BB/3-5 <br />y T T <br />4M10 4M11 <br />BB <br />4M12 4M13 <br />BF <br />4M14 4M15 <br />BK <br />4M16 4M17 <br />D <br />4M19 <br />F <br />4M21 <br />G <br />KEY PLAN O <br />FOURTH FLOOR <br />BUILDING 40-51 <br />RLVIJIUIV JIM»UL UHIL <br />W5523782 D 06.27.2022 <br />4M 11 R <br />10739501 con <br />40-051-4M11R <br />EVERETT, W <br />