Laserfiche WebLink
8" LPS FROM <br />SHEET M316 <br />UH-13 <br />2"\S <br />B <br />4 PS <br />8"LPS 3102 S/HR <br />SIG <br />PI <br />w <br />w <br />w <br />TCV w <br />0-60 L�61 <br />2"\S 3/4" BYPASS <br />T <br />1 "\C <br />w <br />z � <br />w Ln un <br />w m w <br />w J <br />w <br />N N <br />r� <br />0 <br />RIPS <br />CB <br />3 <br />TCV <br />2-1 /2" LIPS <br />3/4" BYPASS <br />3770 S/HR <br />SIG <br />10 <br />1 1 /2" <br />EXISTING 6" COND L_><_� `t( 4"LPS_ _ I2-1/2" LP <br />c <br />RIPS <br />3/4" BYPASS <br />TCV <br />010 /2" <br />3 <br />1 1 /2': <br />T <br />41PS <br />z <br />2482 LBS/HR <br />20 PSIG <br />PI <br />4"LPS— 1241 LBS/HR <br />@ 20 PSIG (2 PLACES) <br />TCV 1 1 /2" <br />020) 3 <br />4"LPS- 1241 LBS/HR <br />@ 20 PSIG (2 PLACES) <br />AIR <br />SEPARATOR TANK <br />1" LPC <br />3"LPS <br />620 LBS/HR <br />20 PSIG <br />GENERAL NOTES: <br />A. FOR GENERAL NOTES AND LEGEND SEE <br />SHEET M2. <br />B. FOR LIST OF RELATED DRAWINGS <br />SEE SHEET M1. <br />3" <br />HRU1 <br />PREHEAT <br />COIL <br />PHC-1 <br />�o <br />Qw <br />w <br />HC-1 <br />REHEAT <br />COIL <br />REHEAT <br />COIL <br />HRU-2 <br />PREHEAT <br />COIL <br />PHC-2 <br />w3: <br />Qw <br />n HC-2 <br />REHEAT <br />COIL <br />REHEAT <br />COIL <br />B <br />1 "\C <br />3/4" BYPASS <br />AVV <br />AVV <br />1 "\C <br />3/4" BYPASS <br />FtENGINEERS <br />PROFESSIONAL STAMP & SIGNATURE <br />APPLIES TO WORK WITHIN THE CLOUDED Seattle H Spokane H Baltimore <br />REVISION AREAS ONLY AS INDICATED <br />CONSTRUCTION NOTES <br />PROVIDE STEAM PIPING, INSULATION <br />FITTINGS. CONNECT TO HEATING <br />COIL. SEE DETAILS 2/M507 AND <br />3/M507. <br />PROVIDE HEATING COIL. PROVIDE <br />BRACKETS AND ACCESSORIES TO <br />MOUNT COIL TO EXISTING UNIT. <br />PROVIDE STEAM TRAP, BYPASS <br />VALVE PIPING, AND COIL <br />CONNECTION PIPING. SEE DETAILS <br />2/M507 AND 3/M507. <br />PROVIDE VALVE FOR HRU-1 AND <br />HRU-2. CONTRACTOR IDENTIFIED <br />LEAKING VALVES ON EXISTING <br />SYSTEM. REMOVE AND REPLACE <br />LEAKING VALVES IN KIND. <br />3"\C 3" \C TO <br />SHEET M317 <br />ISSUED FOR CONSTRUCTION <br />DESIGN BY FSi DATE 06.27.2022 <br />CONSTRUCTION NOTES <br />PROVIDE <br />VALVE FOR HRU-2. <br />CONTRACTOR <br />IDENTIFIED <br />LEAKING <br />VALVES ON EXISTING <br />SYSTEM. <br />REMOVE AND <br />REPLACE <br />LEAKING VALVES IN <br />KIND. <br />© <br />PROVIDE <br />1/3 - 2/3 STEAM <br />CONTROL <br />VALVES. SEE DETAIL <br />4/M508. <br />SYM <br />REVISION <br />BY <br />APPROVED <br />DATE <br />SYM <br />REVISION <br />BY <br />APPROVED <br />DATE <br />® <br />M. Cyq <br />��t� of WAsy, <br />�P <br />W " <br />� <br />,z9 Q. <br />/gT F � <br />�S8/ONAL ENG�O <br />0&27MU <br />sum <br />ACCEPTABILITY <br />THIS DESIGN AND/OR <br />SPECIFICATION IS APPROVED <br />DRAWN <br />E. ROBINETTE <br />DATE <br />5-13-92 <br />SUBTITLE <br />FLOW DESIGN <br />STEAM & CONDENSATE <br />CURRENT REVISION <br />W5523782 <br />SYMBOL <br />B <br />DATE <br />06.27.2022 <br />— <br />RECORD DWG. — LOCKWOOD GREENE <br />3/94 <br />CHECKED <br />V MILLS <br />8-10-92 <br />SHEET <br />M4 <br />A <br />767 VERTICAL PAINT BOOTH VENTILATION W5523782 <br />FSi <br />KMC <br />06.18.2021 <br />ENGINEER <br />D GARNJOST <br />05-13-92 <br />TITLE <br />767 VERTICAL PAINT BOOTH VENTILATION - PHASE 2 <br />BUILDING 40-51 <br />MECHANICAL MASTER 40-51 <br />APPROVED BY <br />DEPT. <br />DATE <br />B <br />767 VERTICAL PAINT BOOTH VENTILATION — PHASE 2 W5523782 <br />FSi <br />KMC <br />06.27.2022 <br />CHECKED <br />V. MILLS <br />8-10-9201 <br />JOB N0. <br />94049.01 <br />COMP N0. <br />00018760 <br />APPROVED <br />BLAKENEY <br />9-11-92 <br />APPROVED <br />H CROTZER <br />9-11-92 <br />DWG NO. <br />40-51-M4 <br />