Laserfiche WebLink
I F-rF-Nln• <br />z <br />5J5 31,25 3,5 5 75 55 4 55 4,5 4 75 55 <br />2 <br />2 <br />F EL. BOP 133'-0" <br />ICI <br />PIPE GUIDE <br />UP TO <br />UH <br />11 <br />AGI AREA <br />BELOW 1 1\2' <br />0 <br />1 1 \2" LPC <br />L <br />C 3/D4" PUMPED COND. <br />co <br />1 <br />3 1 M M1 M65 <br />M1M61 513 <br />0 <br />1 1 /2" CONED ROM <br />ABOVE UH <br />HU <br />12 A21 AC <br />2 9 <br />3 M1 M6 MM513 <br />3/4" PUMF <br />�D COND. <br />I� <br />F <br />LPC <br />3" <br />F <br />LIP04 <br />3" <br />AO <br />COORIDOR <br />J <br />x x x x <br />x x x x x <br />x x <br />6" GR. COND.FROM <br />188'-6" SEE DWG <br />51-214 FOR CONT. <br />ST <br />CL <br />1 <br />1 2" CHWR <br />IT <br />3"LPC <br />OFFICE <br />F <br />3" UP <br />EXIST. <br />ONFERE <br />3 " <br />BREAK <br />RE <br />ROO <br />CE <br />2 1/2 <br />6„ OMNT <br />1 1/2" <br />i A :i <br />�_ 20 '` <br />1 <br />— <br />PC <br />2" IN DRAIN <br />DRAIN PAN, C <br />AND HEATING <br />I <br />— <br />SAN <br />LINE FROM AC-8. <br />OLING COIL, <br />OIL. <br />3 <br />4 <br />STEAM <br />TRU <br />2" H <br />2" H <br />o <br />S <br />❑ <br />S <br />❑ <br />3„ HWS <br />A <br />CHWR <br />PAINTING <br />ISTRUCTURE <br />0 <br />1 1/2" <br />❑ <br />1 1/2" CH <br />❑ <br />WS <br />R <br />3" UP <br />PAINTING <br />I STRUCTURE <br />0 <br />CHWS <br />1 1/2" CHWRL <br />/ <br />1 1 1/2" CHWS <br />3/4" DRAIN BELOW <br />I I <br />M1M61 M <br />MATCH <br />❑ <br />❑ <br />ATION SEE SHT. M1 <br />M63 <br />COILS <br />" HWS <br />R HEA ING <br />(TY <br />❑ <br />.) <br />❑ <br />LINE — FOR CONTIN <br />SYM <br />REVISION <br />BY <br />APPROVED <br />DATE <br />A <br />AS-BUILTS 964058-01 <br />CANADA <br />07.22.96 <br />B <br />ADD STEAM/COND. PIPING TO AHU-20 922865 <br />S.ZAGYI <br />S.ZAGYI <br />01.19.98 <br />C <br />RELOCATE SIGN SHOP OCCUPANT 566221 <br />DJJ <br />09.14.06 <br />D <br />HVAC FOR GRAPHICS 577170-00 <br />DDS <br />DH/FB <br />06.20.08 <br />E <br />HVAC FOR GRAPHICS OFFICE 577170-00 <br />DDS <br />DH/FB <br />06.20.08 <br />SYM REVISION <br />F 767 VERTICAL PAINT BOOTH VENTILATION - PHASE 2 W5523782 <br />MEZZANINE FLOOR PLAN <br />SCALE: 1 /8"= 1 '-0" <br />BY APPROVED I DATE <br />FSi I KMC 106.27.2 <br />PROFESSIONAL STAMP & SIGNATURE <br />APPLIES TO WORK WITHIN THE CLOUDED <br />REVISION AREAS ONLY AS INDICATED <br />FtENGINEERS <br />Seattle // Spokane // Baltimore <br />C <br />�r <br />ACCEPTABILITY <br />THIS DESIGN AND/OR <br />SPECIFICATION IS APPROVED <br />DRAWN <br />T.H. <br />DATE <br />07.22.96 <br />SUBTITLE <br />CHECKED <br />07 22 96 <br />ENGINEER <br />TITLE <br />APPROVED BY <br />DEPT. <br />I DATE <br />Q.C. <br />07.22.96 <br />B <br />1. FOR LEGEND AND ABBREVIATIONS SEE SHT. M1d. <br />GENERAL NOTES: <br />1. INSTALLATION AND DESIGN OF VENTILATION SYSTEMS <br />SHALL BE IN ACCORDANCE WITH SPECIFICATION <br />15145, 15290, 15890, 15910, 15990 AND <br />VENTILATION DRAWINGS. <br />5 2. INSULATE ALL NEW STEAM, CONDENSATE AND <br />A CHILLED WATER PIPE WITH 1" THICK FIBERGLASS <br />PIPE INSULATION WITH WHITE KRAFT <br />VAPOR —BARRIER JACKET. <br />CONSTRUCTION NOTES: <br />1�PROVIDE PIPE GUIDE AT INDICATED LOCATION. REFER TO <br />STRUCTURAL DRAWING S548 FOR DETAIL #4. <br />2�PROVIDE PIPE GUIDE AT INDICATED LOCATION. REFER TO <br />STRUCTURAL DRAWING S548 FOR DETAIL #5. <br />3�PROVIDE PIPE GUIDE AT INDICATED LOCATION. REFER TO <br />STRUCTURAL DRAWING S548 FOR DETAIL #6. <br />®PROVIDE PIPE GUIDE AT INDICATED LOCATION. REFER TO <br />STRUCTURAL DRAWING S548 FOR DETAIL #7. <br />i33 <br />UA <br />UB <br />ISSUED FOR CONSTRUCTION <br />DESIGN BY FSi <br />DATE 06.27.2022 <br />HVAC PIPING MEZZANINE PLAN <br />767 VERTICAL PAINT BOOTH VENTILATION — PHASE 2 <br />BUILDING 40-51 <br />MECHANICAL MASTER COL. A —BB 3— <br />F <br />I I I <br />A <br />KEY PLAN <br />O <br />rt¢vmwry nrmou� ur�ia <br />W5523782 F 06.27.2022 <br />M1M61 <br />JOB No. 57717000 GO <br />SITE DWG NO. 40-51—M1M61 <br />28237 <br />